Electrical Inspection

From Open Source Ecology
Revision as of 15:35, 28 May 2021 by Marcin (talk | contribs)
Jump to navigation Jump to search
  • How to pass - [1]

Guidelines

  • No devices are installed, just wires and boxes
  • PLug holes between floors with insulation of fire block foam to prevent fire spread [2]
  • All wires have wire nuts on them at rough-in