Max Log

From Open Source Ecology
Revision as of 18:12, 28 October 2025 by Goto (talk | contribs)
Jump to navigation Jump to search

Build Pictures

Time Log

Write down morning work done, lunch time, and afternoon work done.

Tue Oct 28, 2025

Morning: 10:05am-12:45pm

  • Installed 2nd sliding door handle/lock and adjusted roller (~5min total)
  • Put up R38 fiberglass insulation into the ceiling, covered about 5 rows

Lunch: 12:45pm-

Afternoon:

Mon Oct 27, 2025

Morning: 10:05-2:30

  • Helped attach roof rafter braces
  • Started attaching some PV panels

Lunch: 2:30-3:30

Afternoon: 3:30-6:20

  • Measured out PV spacing on most runners
  • Attached front PV mounts on most runners
  • Finished installing first row of PV panels


Evening (non-work):

  • Spent 2h after work learning/trying out FreeCAD 1.0