The need for all-weather housing to shelter year-round members of the community, located where summers can be unpleasantly hot and winters unpleasantly cold, can be met with superinsulated designs. Here we will examine some possible options and our progress in bring them into existence. Planning tools, instructions, modifications, etc. will be included.

The Design Page is a good place to see what has been offered and to post any of your own great ideas. More ideas are great for everybody!

Survey & Design

The area on the property for the first group habitation was on a noticeable slope. OSE staff members worked with a home-made water level to take measurements over a 100' square area.

How to make a water level: http://www.youtube.com/watch?v=nAcT_1T25LM

Ideas submitted for this project are located on the Hab Lab Design Gallery page.

Building Orientation

Planning

Kitchen/Bath Water

Utility/Storage Area

Heating

Source Material

http://dnr.mo.gov/pubs/pub781.pdf

Site Preparation

The Hab Lab is designed to be supported by columns built of CEB (Compressed Earth Block)which are constructed on a reinforced concrete pad. Due to the slope of our site, we designed a lowered section which requires a low retaining wall. Included here are instructions for preparing the site with adequate footings.


Here is a picture with a preliminary excavation layout for the column pad sites and the retaining wall in the Hab Lab.

  • When you are laying out the excavation site, be sure to add 5' in each direction for the excavator to work to.


HabLab Excavation Layout.png

This levels diagram is from our theoretical measurements - we actually wound up with a 2' drop, not a 2'8" drop. That will make only a minor difference in raising the building - changing the size of the retaining wall and removing one or two CEB's at the top of the lower columns to maintain the planned roof pitch.

Levels Diagram for Hab Lab Site.png

Foundations & Column Slabs

Laying out the Hab Lab excavation site to be square

Collect equipment and supplies needed

  • Blueprint of site plan
  • (2) 100’ Measuring tapes
  • 4 3-4’ stakes
  • Hammer
  • Bright spray paint

Steps for Staking out the excavation site.

  1. Choose a spot approximately 5 feet to the North and 5 feet to the West of the area to be excavated.
  2. Pound in a stake and spray paint the top foot or two of it.
  3. Measure due East a distance 10’ longer than the foundation width (total 67’).
  4. Place and paint another stake.
  5. Calculate a distance 10’ longer than the foundation length (total 62’).
  6. Calculate the diagonal measurement of the excavation site [Length(squared) x Width(squared) = Diagonal(squared)] (91'4").
  7. Measure due South from the Northwest stake the distance calculated in step 6.
  8. Set the second tape measure on the Northeast stake and measure the diagonal calculated in step 7 going Southwest.
  9. Set your third stake where the two measured lengths meet each other.
  10. Paint the stake.
  11. Measure due South from the Northeast stake the distance calculated in step 6.
  12. Set the second tape measure on the Northwest stake and measure the diagonal calculated in step 7 going Southeast.
  13. Set your fouth stake where the two measured lengths meet each other.
  14. Paint the stake.


  • With the site leveled, the foundation holes for the column slabs must be laid out.
  • After excavation, the stone fill for the foundation goes into the holes.
  • At the same time, the 6" stone floor foundation is spread.

Concrete forms and rebar reinforcing assemblies

These can be built well ahead of need whenever volunteers are available.

  • You could set up an assembly line effect to do them all at once with several people working together.
  • An individual might do one unit at a time.
  • An individual might do all the wood cutting at one time, another do all the rebar cutting at another time, another do all the rebar bending at another time.
  • A couple of people might work together to get some wooden forms assembled once the pieces are cut, another time, a couple of people might work together to get some rebar assemblies welded.

The following step-by-step instructions are provided for building the forms and the reinforcing rebar assemblies.

[Assembly sheet for column pad forms]

[Rebar plan for column footings]


Laying out the locations for the forms on top of the foundation stone

Once the form and rebar assemblies are built and the foundation stone is in place, the string site plan lay-out must be set up for placing the forms properly over their (now invisible) foundations. If you set your hole locating strings far enough out that the excavation didn't disturb them, this will be simple. It will be even easier if you rolled up your strings before the hole excavation got done and saved them. (See comments below!)

Collect equipment and supplies needed

  • Blueprint of site plan
  • 100' tape measure
  • Pre-placed marking stakes around outside of foundation site.
  • Rolled up pre-used string balls from foundation hole layout

Steps for Laying out Column Pad Form locations.

  1. Measure to check that all pre-placed marking stakes are properly positioned.
  2. If any are missing or misplaced, replace or reposition them as needed.
  3. Unroll and retie the strings to their corresponding stakes across the foundation site .

Here's what the layout over the stone should look like.

HabLab Column Pad Form Layout.png


We had a great plan for this - we would set our stakes out first to mark the hole edges at 4'x4', save the strings and move the stakes in by 6" to 3'x3' for the setting the pad forms.

However, when we tried it in real life - Well...

  • We lost a lot of our stakes during the excavation.
  • We found the holes tended to come out bigger than we had intended them to be.
  • And once the stone was laid over the site, we couldn't see where the foundation holes were located!

We wound up remeasuring and resetting most of the stakes for laying out the pad site grid.

  • We dug stone out of two of corners to find the edges of the foundation holes.
  • We remeasured and reset corner marking stakes inside those edges.
  • We retriangulated with the diagonals to assure the foundation square.
  • And we remeasured and reset stakes along all the edges.

So we've rewritten the foundation lay-out plans as they are currently posted. In the current version, we set the stakes at the 3'x3' points to start with so they don't need to be moved. We also emphasized setting them firmly - and safely outside the excavation area.

Setting the column pad forms

Collect equipment and supplies needed

  • Supplies
    • 16 Pre-built column pad forms
    • 80 form stakes (we used 2"x2"x18" wooden stakes)
  • Equipment
    • Heavy Hammer(s)
    • 4'spirit Level
    • Water level
    • tape measure

Steps to place Column Pad forms

  1. Use with the center pad site on the upper level as the reference pad.
  2. Set a pre-built column pad form in place under the string lines with the inside of the forms under the strings.
  3. Drive two form stakes next to the outside of one side and one on each of the other three sides. They will need to sit deep enough that the tops of the stakes will be level with (or lower than) the top of the form.
  4. Level the form.
    1. Screw one of the stakes (on the side with two) to the side of the form so that the form sits 1/2" above the gravel level. Be sure that the top of the stake is level with (or lower than) the top of the form.
    2. Use the spirit level to set this side of the form level and screw it in position.
    3. Use the spirit level to set the opposite side of the form at the same level.
    4. Check the level on the other two sides and screw them in place.
  5. Use the water level to set the first level on each of the other pads on the upper level.
  6. Repeat the remainder of the leveling steps for each form.
  7. Use the water level to set the level of the center form in the lower level at 24" lower than the upper level pads.
  8. Complete the leveling steps for this form.
  9. Use the center form on the lower level for a reference form to set and level the remaining lower level column pad forms.
Setting Column Pad Forms Diagram.png

Preparing Column Pad Forms for Reinforced Concrete

Collect equipment and supplies needed

  • Supplies
    • 16 Pre-built column pad rebar assemblies
    • 64 rebar chairs
  • Equipment
    • Rake(s)
    • shovel
    • tape measure
  1. Use a rake and shovel to remove about 2" of stone from the inside of the form. (until is 6" deep)
  2. Pack removed stone around outside of forms to create a fully enclosed 6" deep form.
  3. Use one prebuilt column pad rebar assembly for each column pad site.
  4. Center the rebar assembly with 3” gap between assembly and form wall on every side.
  5. Set rebar chairs under corners of prebuilt column pad rebar assemblies.-Put a stone or some gravel under the chairs if needed to center the rebar so it will sit at about the middle of the finished slab (3" off the floor of the form).
Preparing Column Pad Sites for Concrete Pouring.png

Concrete Work

Insulated Outside Wall Support Slabs

We are planning to put concrete the full 3' width of the Column Support Pads all the way around the outside of the building. They will be 3-1/2" (2x4 lumber size) deep and will support the two CEB walls that enclose the hay bale insulation.

Narrow Wall Support Slabs

We will support and stabilize the interior CEB walls with a 12" wide x 3-1/2" deep concrete slab.

Kitchen and Bath Areas

The Kitchen and Bath Floor Areas both have a potential for receiving noticeable amounts of water. We consider it advisable to pave them both with concrete and include a central drain.

Retaining Wall for Lower Level

CEB Columns

[CEB PDF]

CEB Arches

[Vaults PDF]

[Test Hammer] for quality assurance

CEB Floors

[Floor Instructions]

Insulated Roof

11 member 2x6 frames, one on each end and 24" centers. One above and one below the bales.

Lathe 1x2 layed diagonally across the top of the bottom frame at 18 inch intervals to support the bales.

Bales packed close together in a grid.

second layer of 2x6 frames strapped through the bales to the lower layer (details needed here)

metal roofing applied to the top surface and sides

Super Insulated Walls

2.5 foot thick wall.

4x6x12 bricks laid on the 12x4" side in standard wall layup, two walls outside surfaces 2.5' apart.

With air space left on either side, bales are stacked in the center of the wall, creating super insulation between the interior and exterior.

Heating the HabLab

I propose a [Heatkit] masonry furnace kit, surrounded by CEB