XM

From Open Source Ecology
Revision as of 04:41, 10 March 2012 by Marcin (talk | contribs) (Undo revision 56146 by Marcin (talk))
Jump to navigation Jump to search

Extreme Manufacturing Notes

  • If design is separated from build, cost increases - with reference to Open Capitalist Platform. How to incorporate rapid delivery into Open Capitalist Platform.
  • Assure integration via Contract-First Manufacturing (CFM)
  • Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)
    • TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping
  • MMF - Minimum Marketable Feature
  • Definition of Ready - Ex. Replication of Wikispeed Car
  • Definition of Done -
    • Ex: 100mpg equivalent 2 passenger pelletized biomass-fueled Wikispeed car