A Status Brief should provide a quick summary of the existing state of the project. A Status Brief shall update the latest developments, issues encountered, and future directions. This should be documented by the Scrum Master on a daily basis, so a spreadsheet of status should be maintained in the form of a spreadsheet.
In addition to the Status Brief - one should in general be able to assess the general state of the project by viewing all the Work Product for the overall product sheet in the Control Panel window. Note that the Control Panel displays both the entire product, and its components. Clicking on the component sheets should reveal the Work Product there. More general perspective can be obtained from tej