Chuck Log
Jump to navigation
Jump to search
Intro
A chronological log for Chuck Harrison, occasional off-site collaborator.
Log
18-Nov-2012 thru 24-Nov-2012
- sync grbl to upstream..success.
- replaced mechanical microswitches on X1-X2 axis with photointerrupters..success. Testing
11-Nov-2012 thru 17-Nov-2012
- start log.
- ship Millermatic 200 welder (Seattle craigslist) by LTL truck to FEF. 400 lbs for $500; was that reasonable?
- steppernug (open source stepper driver) schematic review with Darren
- received photointerrupters for torch table testing
- looking into "does not quite reach position" bug in my grbl branch
Ancient history
First contact with OSE Sept 2011 briefly on site. I was in the area visiting relatives David Ihnen and Margaret Havens.