Oldest pages
Jump to navigation
Jump to search
Showing below up to 50 results in range #5,901 to #5,950.
- LifeTrac 6 Deliverables Board (19:01, 11 September 2013)
- LifeTrac 6 Master Review Checklist (19:09, 11 September 2013)
- LifeTrac 6 Schedule (19:16, 11 September 2013)
- Photo to 3D (22:23, 11 September 2013)
- Graphical Tools Template (13:46, 12 September 2013)
- LifeTrac 6 Build Critical Path (13:59, 12 September 2013)
- Mass Rollout (14:02, 12 September 2013)
- Trencher Prototype 1 Video (15:50, 12 September 2013)
- Laser Cut Scale Model of Brick Press Frame (17:47, 12 September 2013)
- STL and Gcode Files for 3D Printing (19:44, 12 September 2013)
- CAD File Formats from GrabCAD (20:59, 12 September 2013)
- Favorite Quotations (02:50, 13 September 2013)
- Meal Log (03:35, 13 September 2013)
- LifeTrac 6 Requirements (13:33, 13 September 2013)
- Power Cube WS (18:57, 13 September 2013)
- Critical Path for Development (19:42, 13 September 2013)
- OSH Development Critical Path - Secondary (21:02, 13 September 2013)
- North Utility Line (22:41, 13 September 2013)
- Further Comments on Fabrication Diagrams (23:34, 13 September 2013)
- CEB Press Fabrication Diagram (23:34, 13 September 2013)
- Africa (02:12, 14 September 2013)
- Unofficial Africa Crew (02:15, 14 September 2013)
- Shot List Template (02:28, 14 September 2013)
- Shot List (02:35, 14 September 2013)
- Tools-Supplies-Infrastructure Preparation (02:48, 14 September 2013)
- OSE Specifications Assessment Template (02:58, 14 September 2013)
- Requirements Spreadsheet (03:06, 14 September 2013)
- Testing Protocol (03:19, 14 September 2013)
- Power Cube Design Rationale (11:19, 14 September 2013)
- GVCS in 2 Minutes (14:50, 14 September 2013)
- String Trimmer (14:51, 14 September 2013)
- Bale Munching (14:53, 14 September 2013)
- Trencher Prototype I (14:58, 14 September 2013)
- LifeTrac Construction Set Video Script (16:07, 14 September 2013)
- Sharelex (19:45, 14 September 2013)
- Production Time Template (01:57, 15 September 2013)
- Cost Calculation (02:52, 15 September 2013)
- Weight Calculation (02:52, 15 September 2013)
- Sketchup to Build Sequence (03:35, 15 September 2013)
- Microhouse Build Planning (17:04, 15 September 2013)
- Microhouse 2013 Discussion (17:04, 15 September 2013)
- Hablab Chore Chart & Laundry Schedule (19:40, 15 September 2013)
- Power split device (20:16, 15 September 2013)
- Tilting Suspension (20:16, 15 September 2013)
- Universal Mobility Construction Set (20:17, 15 September 2013)
- Open Hardware Development Critical Path (01:57, 16 September 2013)
- LifeTrac 6 Build Checklist (02:48, 16 September 2013)
- Dozuki Documentation Standards (15:56, 16 September 2013)
- Lasersaur Build (18:00, 16 September 2013)
- Audrey Control Panel Sandbox (20:31, 16 September 2013)