Power Cube - Build Videos

From Open Source Ecology
Revision as of 21:14, 24 September 2013 by Marcin (talk | contribs)
Jump to navigation Jump to search

Using cutting stops, it takes 40 minutes to cut with torch and grind edges of 12 Power Cube frame members, 32", 40", 48" long - out of 10' stock sections.