Catarina Log
Jump to navigation
Jump to search
Mon Mar 3, 2014
FeF Requirements for Year-round Operation
HabLab
- Insulate bathroom/kitchen wall
- Better water heater
- Sufficient heating for common room, kitchen, bathroom and bedrooms
- Finish interiors (paint walls/floor, close holes, finish ceiling, etc)
- Mud room (physically separate from main room)
- Covered porch/patio
- Outdoors and indoors firewood rack
- Finish exterior rooms
- Robust plumbing
- Robust water system
- Robust electrical system
- Robust internet
- Extra propane gas storage
Exterior
- Gravel or wood chip paths connecting all buildings - for both pedestrians and vehicles
- A way to shovel/clear snow-covered paths
- Solar lights or reflective cells along the paths
MicroHouse
- Draft insulation
- Permanent (buried) water system
- Permanent sewage system
- Permanent electrical system (30A)
- Internet connection
- Two additional modules (bedroom + living/working room)
- Heating on all modules
- Covered porch/patio
- Firewood rack
- Extra propane gas storage
Workshop
- Second stove
Fri Jan 16, 2014
Looked into Swimming Pool idea for morale management.