Jasonshah log
Jump to navigation
Jump to search
June 3, 2014
- Started the work on instructional for the Secondary Cylinder Assembly of the CEB 6 Press
((CEB 6 Press_Sec Cylinder Assembly.fcstd))
- Coordinated the workshop area for access to Power Machines and Hydraulics units.
- Worked with a group to assemble the CEB 6 Press.
June 2, 2014
- Morning session: Learning about features in the OSE Collaboration Architecture
- Build session: Built a 4' * 8' prototype for a panel. Used 2" * 4" wooden beams and screws. These panels can be used for walls, decks. For info go to, chrisc_log
June 1, 2014
- Arrived on Factor e Farm Campus. Orientation with the summer team.