Jose Antonio log
2014-07-16 (Wednesday):
- 19:00: Arrival to MCI airport. - 21:00: Arrival to Factor eFarm. - 23:00: Sleep
2014-07-17 Thursday:
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github. - 10:00: Teamwork to redesign the OSE documentation system. - 13:00: Video record to show the progress on documentation system. - 13:30: Lunch. - 14:30: Back to work. Made a power converter EU -> US. - 15:30: Continue with the redesign of the documentation and development system. - 19:20: - Adopting Trello for the DMAIC team. - Analyzing the existing documentation platform. - Setting up a infinoted test service, installing the gobby client, show it to the team.
2014-07-18 Friday:
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press. - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller. - 17:30-18:00: Visit to the Workshop. - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.
2014-07-19 Saturday:
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code. - 14:30-16:30: Coding the CEB Press microcontroller. - 16:30-17:30: Helping out to take out some sand. - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.
2014-07-20 Sunday:
- Resting day.
2014-07-21 Monday
- Brick press team. Moving the head of the machine. - Grinding and welding during the whole afternoon.
2014-07-22 Tuesday:
- Morning: Publicity team. - Afternoon: Workshop, handling steel bars for the Microhouse 3.
2014-07-23 Wednesday:
- The whole day: bending bars for the Microhouse 3. - Some welding practice.
2014-07-24 Thursday:
- Morning: Moving soil for the Microhouse 3. - Afternoon: Handling and measuring steel bars for the Microhouse.
2014-07-25 Friday:
- Morning: Moving soil for the Microhouse 3. - Afternoon: Writting the next version for the CEB Press.
Git repository: https://github.com/jaqm/Open-CEB-Press
2014-07-26 Saturday:
- Resting day: relax, pool, more relax, some time writting code, more relax.
2014-07-27 Sunday:
- The whole day: writting the firmware for the CEB Press. - Helping to move steel bars from the workshop to the microhouse.
2014-07-28 Monday:
- Cleaning and reviewing the code for the CEB Press.
2014-07-29 Tuesday:
* CEB Press firmware: - Review high pressure sensor flag support. - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence. * Cutting wood and wires for the MicroHouse. * Dragging the pool to solve the licks.
2014-07-30 Wednesday:
* CEB Press firmware: - going deep more into details of the auto-mode algorithm. * Fixing the licks of the pool.
2014-07-31 Thursday:
* Seeting up the testing CEB Press. * Pressing some bricks in the production Brick press.
2014-08-01 Friday:
- Built a picnic table.
- Taking pictures of the Velocar workshop.
2014-08-02 Saturday:
- Helping to print parts for the battery of the Velocar during the whole day and part of the evening.
2014-08-03 Sunday:
- Baked some bread.
2014-08-04 Monday:
- Cleaning/organizing the buckets at the workshop.
- Moving pallets and pieces of wood to cut.
- Moving soil for the brick press.
2014-08-05 Tuesday:
- Mounting the rollers for the Brick Pressing "Factory".
- Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!
2014-08-06 Wednesday:
- Cutting, pressing, drilling bars for the doms.
2014-08-07 Thursday:
- Mounting doms.
- Preparing the Microhouse Workshop.
2014-08-08 Friday:
- Microhouse workshop starts.
2014-08-09 Saturday:
- Carpintery: building modules.
- Pressing bricks.
2014-08-10 Sunday:
- Carpintery: building modules.
- Pressing bricks.
2014-08-11 Monday:
- Laying bricks.
2014-08-12 Tuesday:
- Last day of the workshop.
2014-08-13 Wednesday:
- Day off.
2014-08-14 Thursday:
- Day off.
2014-08-15 Friday:
- Assembling a structure to cover the microhouse.
- Making work the pool pump.
2014-08-16 Saturday:
- Group meeting.
2014-08-17 Sunday:
- Melting alluminium.
- First test of the new firmware on the CEB Press.
- Adding new features and solving bugs on the new CEB Press firmware.
2014-08-18 Monday:
- Tuning and solving bugs on the new CEB Press firmware.
- Cutting steel tubes.
- Cutting aluminum.
- Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.
- Taking down the dom.
2014-08-19 Tuesday:
- Uploading the pictures I took yesterday.
- Searching contact info of similar organizations to OSE to improve social networking.
- Replacing the saw of the bendsaw.
2014-08-20 Wednesday:
- Cutting aluminum.
- Fixing the 3D-Printer, started to print little pieces for its self-improvement.
2014-08-20 Thursday:
- Moving some boards to the old workshop.
- Filtering and uploading pictures to trovebox fo the powercube documentation.
- Found a Raspberry Pi. Set it up and now it's working on the "wireless" network.
- Fixing the Rbick Press. We didn't finished so we will tray again the next day if's possible.
2014-08-21 Friday:
- Rainy day.
- Fixed the test controller board. There was another pin that wasn't working.
- Improving and fixing a bug in the new brick press code.
- Fixing the brick press.
- Covering the microhouse to protect it against rain.
2014-08-21 Saturday:
- Fixing the brick press.
2014-08-22 Sunday:
- Fixing the brick press. The teensy and the fuse are broken.
- Order a new Teensy for the Brick Press.
- I finally publish the worklog.
2014-08-23 Monday:
- Assemblying the CEB Press testing machine.
- Assemblying the Power Cube in progress.