Rammed Earth Foundation
Jump to navigation
Jump to search
This is a protocol for building foundations of rammed earth. It is from the Auroville Earth Institute. See full description here (website pdf-copied [xxxx here]).
Basics:
- used in Auroville for all kinds of buildings (up to 4 floors high).
- soil is excavated, sieved, then sand added
- 5 % by weight of cement (500 litres soil + 200 litres sand = 1 bag cement, 50 Kg)
- start ramming