Catarina Prusa i3 Build

From Open Source Ecology
Jump to navigation Jump to search

Module 1

  1. 58 minutes to the idler. Exactly 2x over optimum time.

Module 2 - Extruder Carriage

  1. 23:10 for time - :50 over world record

Module 3 - Z Motors

  1. 17:54 cf 8:50 olympic record.

Module 4 - Heat Bed

  1. 43:22, or 29:12 if parallel cf 27:30.

Module 5 - Bed Motor

  1. 4:40 cf 3:45.

Module 6 - End Stops

  1. 5 min of 3:30 world record

Module 7 - Extruder assy

  1. 14:40 using soldering iron for heatshrink. Beat the world record of 16:20.

Module 8 - Power Supply

  • 33:52 cf 20:30

Module 9 - Controller

  1. 9:06 cf 3:00

Module 10 - Controller

  1. 17:30 cf 12:40, with several minutes wasted on doing combined bundle instead of separate.
  1. About 3hr 30 min total.

Overall Assembly

  • 2:26