Build Certification

From Open Source Ecology
Revision as of 16:57, 12 November 2018 by Marcin (talk | contribs) (→‎Procedure)
Jump to navigation Jump to search

Procedure

  1. Build frame. 3 detailed Finished Pictures showing the amount of epoxy used on inside bottom, inside sides, and inside top. Time.
  2. Build Y Left Axis twice. Finished Picture from the side opposite of the motor. Time.
  3. Build Y Right Axis twice. Finished Picture from the opposite side of the motor. Time.
  4. Build X axis. Finished picture from motor side. Time
  5. Build extruder assembly.
  6. Build heated bed (PEI addition + twist white wire around red. Finished icture from both sides. Time.
  7. Build control panel. Finished picture from both sides. Time.
  8. Mount Y axes and Z axes. Finished Picture. Time.
  9. Mount the X axis. Finished picture. Time.
  10. Mount heated bed. Finished picture. Time.
  11. Mount extruder. Finished picture. Time.
  12. Do cable chain and all wire routing and tidying.