Sara Kit Certification
Jump to navigation
Jump to search
Build Space
Make a copy of:
Main Checklist
Electronics Checklist
Build
Kit Build
Time Lapse
One can study the time lapse in detail to understand the build time. This time lapse should span about 7-8 hours. Rework time was about 1.2 hours.
Time Log
Issues
Evaluation
Overall kit evaluation is this based on Kit Certification#Evaluation
Sara Comments and Improvements
Links
- Kit Certification
- Current Material inventory - [1]
- 3D Printer Logs - for parts production