Sara Kit Certification
Jump to navigation
Jump to search
Build Space
Make a copy of:
Main Checklist
Electronics Checklist
Build
Kit Build
Time Lapse
One can study the time lapse in detail to understand the build time. This time lapse should span about 7-8 hours. Rework time was about 1.2 hours.
Time Log
And comments. Time is in minutes. Negative sign - time to be subtracted and added to the Kit Prep phase, not Build Phase.
- 15:42 - Start. Unpack. Weld frame. Set up camera. Includes going from house to workshop. Time: 37
- 16:19 - Axis assembly start. Y + Z rear. Missing tool: tape spacer. Time: 7
- 16:26 - Error warning: set screw allen wrench short side wore out mid way. Got another one. Time: -2
- 16:28-16:34 - Cleaning out idler pieces . Time: -7
- 16:35 - Tape on bearings. Not needed in practice. Time: -3
- 16:39 - Finished bearing insertion for all axes. Time: 2
- 16:56 - Y left finished - Time: 25 minutes
Issues
Evaluation
Overall kit evaluation is this based on Kit Certification#Evaluation
Sara Comments and Improvements
Links
- Kit Certification
- Current Material inventory - [1]
- 3D Printer Logs - for parts production