Sara Kit Certification

From Open Source Ecology
Revision as of 23:22, 14 November 2018 by Marcin (talk | contribs) (→‎Issues)
Jump to navigation Jump to search

Build Space

Make a copy of:

edit

Main Checklist

edit

Electronics Checklist

edit

Build

edit


Kit Build

Time Lapse

One can study the time lapse in detail to understand the build time. This time lapse should span about 7-8 hours. Rework time was about 1.2 hours.

Time Log

And comments. Time is in minutes. Negative sign - time to be subtracted and added to the Kit Prep phase, not Build Phase. Total time of build does not include negative times.

  1. 15:42 - Start. Unpack. Weld frame. Set up camera. Includes going from house to workshop. Time: Frame: 37-
  2. 16:19 - Axis assembly start. Y + Z rear. Missing tool: tape spacer. Time: 7
  3. 16:26 - Error warning: set screw allen wrench short side wore out mid way. Got another one. Time: -2
  4. 16:28-16:34 - Cleaning out idler pieces . Time: -7
  5. 16:35 - Tape on bearings. Not needed in practice. Time: -3
  6. 16:39 - Finished bearing insertion for all axes. Time: 2
  7. 16:56 - Y left finished - Time: 25 minutes
  8. 17:03 - Z back finished - Time - 7 minutes
  9. 17:15 - Y right, Z front done - Time - 12 minutes. Total for all axes outside of X - 44
  10. 17:23 - Y left and Z back axes mounted on frame. Time - 8
  11. 17:29 - Y right, Z front hung on frame - Time - 6

Issues Log

  1. 2 top half circles of carriage pieces all had extra plastic on them. Needed cleaning.
  2. Thermistor head was on top face, not in hole:

edit

Evaluation

Overall kit evaluation is this based on Kit Certification#Evaluation

Sara Comments and Improvements

Links