CEB Floor
Jump to navigation
Jump to search
Seed Eco-Home 2016
Microhouse 1 2013
For the CEB floor, a layer of sand is used to keep all the block level. A team of 2-4 can do 144 square foot floor in less than a day.
Keep it flat using a level:
Final structure with CEB floor.
In Microhouse 1, we used unstabilized CEBs. We had a couple of water leaks and the CEB floor degraded, so we retrofitted a wood floor. In the humid Missouri climate, we have seen mold issues because Microhouse 1 was not air conditioned.