Competitive Waste in Construction

From Open Source Ecology
Revision as of 21:35, 21 March 2022 by Marcin (talk | contribs) (Created page with "*The different trades - foundation, framing, rough-in, finishing, siding, MEP - have an adversarial relationship - as in, 'why did trade X (they) make it so hard for trade...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • The different trades - foundation, framing, rough-in, finishing, siding, MEP - have an adversarial relationship - as in, 'why did trade X (they) make it so hard for trade Y (me) to do my job? Those dumbasses!' The practical ourltcome is cost increase by virtue of extra materials or time needed to do an equivalent job if it were designed better.