Seed Eco-Home 4 Data Collection
Jump to navigation
Jump to search
- Friday Dec 2, 2022 - Laser level and evening high spots - about 25 minutes? Meter reading - . All together today - 5 hrs including selecting final location, calculating diagonals, figuring out foundation detail, starting micro excavator work.
- Thu Dec 1 -Smoothing - 1044.4 - 1045.5 - 1.1 hrs.
- Dig time - 1042.1-1044.4 - 2.3 hrs. Finishing of bulk digging.
- Dig time - 4:10 on Sunday. Bulk of the diggin. Key is to get into mindless flow, which is possible with ample soil, and is definitely easier if the soil is not rock hard like clay. 1038.0-1042.1
- Scrape time for grass for 70x50 area - 2 hrs. Start hour meter = 1036.0