Solar Brick Production

From Open Source Ecology
Revision as of 11:33, 1 June 2024 by Marcin (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • 0.4 kWhr/kg in 2050 [1]
  • Current standard is about 0.6 kilowatt hours per kilogram [2]
  • 50kW pV gets 400 bricks per day - really 200 as each is 2 kg. Not a lot.
  • Unstabilizes CEB is worth it, after that, it is useful to do fired brick for water resistance. Not. Cement is 1.5 kWhr/kg (5.6 MJ/kg?)- at 10% stabilization, we have CEBs at 150 whr/kg