RLF Build Log
Jump to navigation
Jump to search
Work Doc
Mon Aug 4, 2025
- Header - used tiedown strap to pull in sides, as right side was 1.5" off vertical. Cut header to fit. Nailed through king stud. [1]. Album - [2]
Sat Aug 2, 2025
- Major lessons - no mods to modules.
- Numbered and prepared ahead of time.
- Major block once the T caps entered - blocking was impossible so it meant drilling holes to attach blocking. And slitting the OSB, weakening shear capacity.