Tub Drainage RLF Module

From Open Source Ecology
Revision as of 03:39, 13 October 2025 by Marcin (talk | contribs) (→‎Tub Overflow Assembly Order)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Tub Overflow Assembly Order

Order video -[1]

Steps:

  1. Attach overflow on top of tub, washer outside.
  2. Attach bottom overflow, washer outside. Point - overflow side holds the bottom overflow in place - so this can be done with one person instead of two people on each side of tub. The overflow holds the bottom overflow - so it can be tightened with pliers from the inside of the tub.
  3. However - next modify to solid PVC for unserviceable locations.