Financial Independence Package Intake Form

From Open Source Ecology
Revision as of 02:05, 25 October 2025 by Marcin (talk | contribs) (Created page with "= Financial Independence Package – Intake Form = Thank you for your interest in the Financial Independence Package. This form helps us understand your goals, your build site, and your readiness for a house delivery and build. Please answer as completely as possible. Once we review your submission, we will schedule a call with you. == ''Section 1 – Contact Information'' == * Full Name * Email * Phone * City, State/Province, Country * Preferred Communication Method (...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Financial Independence Package – Intake Form

Thank you for your interest in the Financial Independence Package. This form helps us understand your goals, your build site, and your readiness for a house delivery and build. Please answer as completely as possible. Once we review your submission, we will schedule a call with you.

Section 1 – Contact Information

  • Full Name
  • Email
  • Phone
  • City, State/Province, Country
  • Preferred Communication Method (Phone, Email, Text, WhatsApp, Other)

Section 2 – Your Land and Build Site

  • Do you currently own land? (Yes / No / Under Contract / Searching)
  • Land Address or General Location (if owned)
  • Zoning Type (Residential / Agricultural / Rural / Other / Unknown)
  • Approximate Acreage
  • Terrain & Access Notes (flat/hilly, trees, driveway length, slope, etc.)
  • Are there building codes in your area? (Yes / No / Unsure)
  • How do you plan to classify your structure?
    • Primary Residence
    • ADU
    • Farm Building
    • Barn / Ag Exempt
    • Other / Not sure yet
  • Have you spoken with your local building department yet? (Yes / No / Scheduled / Not yet but will)

Section 3 – Permitting & Building Department Requirements

  • What permits are required in your jurisdiction? (check all that apply)
    • Building Permit
    • Zoning / Land Use
    • Septic / Wastewater
    • Well / Water Access
    • Driveway / Access
    • Electrical Permit
    • Plumbing Permit
    • Mechanical / HVAC Permit
    • Other / Unknown
  • Which parties are required on a permit in your area? (check all that apply)
    • Owner-Builder Allowed
    • General Contractor Required
    • Licensed Electrician Required
    • Licensed Plumber Required
    • Licensed HVAC Required
    • Engineer / Architect Stamps Required
    • Not yet determined
  • What inspections are required? (framing, foundation, electrical, plumbing, mechanical, final, etc.)
  • Does your jurisdiction allow owner-builder construction? (Yes / No / Unsure)

Section 4 – Delivery & Site Equipment

  • Do you have (or will you have) a way to unload modular sections from a trailer?
    • Telehandler
    • Forklift
    • Crane
    • Tractor with forks
    • Will rent equipment
    • Not sure yet
  • Is there access for a semi-truck and/or 40–50 ft trailer to reach your build site? (Yes / No / Unsure)
  • Are there overhead wires, sharp turns, bridges, or other delivery challenges? (describe)

Section 5 – Utilities & Site Infrastructure

  • Water Source (Well / City / Haul-in / Other / Unknown)
  • Wastewater (Septic / Sewer / Compost / Unknown)
  • Power (Grid / Off-grid / Hybrid)
  • Do you want help with electrical, plumbing, and HVAC installation? (Yes / No / Maybe)
  • Target installation timeline (1–3 months / 3–6 months / 6–12 months / 1 year+)

Section 6 – Your Goals & Readiness

  • What is your main motivation?
    • Financial independence
    • Debt-free housing
    • Homestead / land freedom
    • Off-grid independence
    • Family legacy
    • Other
  • When would you ideally like to start building?
  • How soon are you ready to place a deposit if accepted?
    • Immediately
    • 1–3 months
    • 3–6 months
    • 6–12 months
  • Any questions, concerns, or notes?