May Production Plan

From Open Source Ecology
Revision as of 13:43, 16 June 2011 by Marcin (talk | contribs) (Created page with "Strategy: *List steps in order of duty – Power Cube to Tractor to CEB press *Assess capacity required *Allocate tasks to 6 fabricators and local shop *List risks and recovery ...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Strategy:

  • List steps in order of duty – Power Cube to Tractor to CEB press
  • Assess capacity required
  • Allocate tasks to 6 fabricators and local shop
  • List risks and recovery plans
  • Assess daily, before and after workday

Power Cube Tasks

Shake Down Motor Size

  • Measure Power Cube and location of mount
  • [2] Cut Mount – 1/4x4 by appropriate measurement
  • [2] Drill Mounts – 2 holes on ends each
  • Transfer punch mount hole locations
  • Mag drill holes in frame
  • Prepare Power Cube Mount
  • Mount Power Cube on Tractor

Build Hydraulic tank

  • Grind tanks down to clean
  • Clean edges and bungs
  • Ream any necessary holes
  • Lay out 3 sets on welding table
  • Close off bungs with fittings
  • Tack everything
  • Weld
  • Assemble