May Production Plan
Jump to navigation
Jump to search
Strategy:
- List steps in order of duty – Power Cube to Tractor to CEB press
- Assess capacity required
- Allocate tasks to 6 fabricators and local shop
- List risks and recovery plans
- Assess daily, before and after workday
Power Cube Tasks
Shake Down Motor Size
- Measure Power Cube and location of mount
- [2] Cut Mount – 1/4x4 by appropriate measurement
- [2] Drill Mounts – 2 holes on ends each
- Transfer punch mount hole locations
- Mag drill holes in frame
- Prepare Power Cube Mount
- Mount Power Cube on Tractor
Build Hydraulic tank
- Grind tanks down to clean
- Clean edges and bungs
- Ream any necessary holes
- Lay out 3 sets on welding table
- Close off bungs with fittings
- Tack everything
- Weld
- Assemble