Factor e Farm Infrastructure Buildout 2011

From Open Source Ecology
Revision as of 22:34, 18 June 2011 by Marcin (talk | contribs) (Created page with "=Introduction= 2011 marks the buildout of Factor e Farm for the purpose of absorbing 12 people full time with comfortable accommodations and work space. The planned infrastructu...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Introduction

2011 marks the buildout of Factor e Farm for the purpose of absorbing 12 people full time with comfortable accommodations and work space. The planned infrastructure buildout includes 6 superinsulated studios, 6 more 3-season studios, common kitchen, common shower/bathroom, electrical power infrastructure, and 3000 square foot workshop addition

Infrastructure Plan

We will allocate $60k to this project as follows:

  • $1k - baler
  • $4k - fully automatic CEB press (2 total)
  • $3.5k -
  • $2k - 20 kW-hr forklift battery bank
  • $1k - 5 kW inverter, 24V
  • $2k -