Talk:Open Source Biodigester Calculations

From Open Source Ecology
Revision as of 19:50, 17 January 2026 by Eric (talk | contribs) (Added some thoughts of mine)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Doing the math in terms of Drain Fixture Units / Fixture Units is probably advisable for Plumbing related napkin math.

In terms of the bioreactor itself, i’ll have to dig more (and this would be a good question for Liberty), BUT Residence Time and models of a Continuous Stirred-Tank Reactor Anaerobic Digestion System are probably the keyworks for models, but Cubic Meters and Liters are the units of choice probably?

--Eric (talk) 19:50, 17 January 2026 (UTC)