The Energy Question Has an Easy Solution
Jump to navigation
Jump to search
Energy payback is now as little as 0.5 years for utility scale PV. Not counting any open source integrated design improvements. To take it to 0.25 year energy payback time, which is impossible, and thus a perfect project for OSE to take on.
But if we start with 1MW of PV power, and use 1/2 of that for producing more PV - then the time to breed 20TW, starting from 1 MW - is :
Embodied Energy of PV
| Component | Description | Typical Embodied Energy Share (% of module) |
|---|---|---|
| Silicon Feedstock & Ingot | Quartz → polysilicon → crystal growth (Czochralski or similar) | 25–40% |
| Wafering | Slicing ingots into wafers (kerf loss, sawing energy) | 10–20% |
| Cell Processing | Doping, diffusion, etching, deposition (PECVD), metallization | 15–25% |
| Glass (Front Sheet) | Tempered low-iron solar glass (~3–4 mm) | 10–20% |
| Encapsulant (EVA/POE) | Polymer layers for lamination | 3–8% |
| Backsheet (or rear glass if bifacial) | Polymer backsheet or second glass layer | 3–10% |
| Aluminum Frame | Extruded frame + finishing | 5–15% |
| Junction Box & Wiring | Diodes, copper wiring, connectors | 2–5% |
| Module Assembly | Lamination, curing, handling, factory overhead | 3–8% |
| Total | ~100% |