CEB Press/Manufacturing Instructions/Arms - secondary
Jump to navigation
Jump to search
Main > Housing and construction > CEB Press > CEB press building instructions
The secondary arms connect the primary arm/frame assembly to the legs to support the structure.
Tools Required
- Cutting Torch
- Angle Grinder
- Welder
Materials Required
- 2 pieces 72" long - 4"x6"x3/8" angle steel
- Leg Holders (8)
- 3/4"x2" bolts (4)
- 3/4" nuts (4)
Diagrams
Fabrication Steps
1) Clamp one angle iron arm to each side of the primary arms, the 6" side to the underside of the primary arms, with the 4" side facing outwards from the assembly. 2) Torch thru the holes on the primary arms to make two 3/4" holes on each secondary arm. 3) Clean up the torch slag with an angle grinder 4) Bolt the primary and secondary arms together and tighten them down. 5) Clamp the leg holders in their proper locations and weld them in place. (See diagram)