CEB Press/Manufacturing Instructions/Sensor Unit
Jump to navigation
Jump to search
Main > Housing and construction > CEB Press > CEB press building instructions
Tools Required
solder iron heat gun wire cutter/stripper lighter
Materials Required
hall effects sensor 1/2" poly pipe 5/8" o.d. underground telephone cable 4 wire potting compound disposable mixing cups tape cat5 cable shrink wrap
Diagrams
Fabrication Steps
- cut telephone cable 70" long
- strip shielding plastic 1.5" and 8" at either end
- solder hall effects sensor