OSE Shop 2011 Prepare Column Pad Sites

From Open Source Ecology
Revision as of 05:44, 27 August 2011 by DavidIAm (talk | contribs)
Jump to navigation Jump to search

Prepare Column Pad sites Set the pre-built column pad forms in place under the string lines. Stake them in place with form stakes per lay-out. Remove stone 2” deep inside forms. Pack removed stone around outside of forms. Use one prebuilt column pad rebar assembly for each column pad site. Center the rebar assembly with 3” gap between assembly and form wall on every side. Set rebar chairs under corners of prebuilt column pad rebar assemblies per diagram.

Prepare Column Pad sites layout.png