OSE Roof Instructions

From Open Source Ecology
Revision as of 18:12, 13 September 2011 by Margaret Ida (talk | contribs) (Created page with " ==ASSEMBLY SHEET FOR WORKSHOP ROOF STRINGERS * Cut one 16’ 2x6” beam to create one 10’8” piece and one 5’4” piece * Cut one 16’ 2x6” beam to create one 10’ pie...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

==ASSEMBLY SHEET FOR WORKSHOP ROOF STRINGERS

  • Cut one 16’ 2x6” beam to create one 10’8” piece and one 5’4” piece
  • Cut one 16’ 2x6” beam to create one 10’ piece and one 6’ piece
  • Cut two 16’ 2x6” beams to create two 11’ pieces and two 5’ pieces
  • Cut one 16’ 2x6” beams to 14’ in length.
  • Cut a diagonal piece off one 11’ piece and one full 16’ piece as shown.
  • Lay out a 32’ assembly as shown in the diagram
  • Spread glue on the 5-1/2” faces and screw together as shown in the detail at about 18” intervals.
  • Lay out a 43” assembly as shown in the diagram.
  • Spread glue on the 5-1/2” faces and screw together as shown in the detail at about 18” intervals.

Make 5 of each assembly



==ASSEMBLY SHEET FOR SUPPLY SHED ROOF STRINGERS

  • Cut four 16’ 2x6” beams to create four 10’8” pieces and four 5’4” pieces.
  • Lay out a supply shed stringer assembly as shown in the diagram.
  • Spread glue on the 5-1/2” faces and screw together as shown in the detail at about 18” intervals.



RoofStringers.png