Factor e Farm Power Infrastructure Problem Statement

From Open Source Ecology
Revision as of 02:26, 19 September 2011 by Marcin (talk | contribs) (Created page with "=Introduction= Factor e Farm operates off-grid, with a 1400W peak bank of solar panels and a 20kW battery bank, with 3kW inverters. We run Power Cubes and a 20kW ST Generator fo...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Introduction

Factor e Farm operates off-grid, with a 1400W peak bank of solar panels and a 20kW battery bank, with 3kW inverters. We run Power Cubes and a 20kW ST Generator for welder and plasma cutter power, as well as for powering all hydrauilic devices.

Improvements

Several improvements need to be installed for OSE Shop 2011 and the rest of 2011 construction.

  1. First, a stove needs to be installed for heating. We can accomplish space heating and water heating using Gasifier Burner Stoves