Nicks January-February Work Goals

From Open Source Ecology
Revision as of 01:31, 26 January 2009 by Nickr (talk | contribs) (New page: Jan 26th: Complete boiler research: Feed Pump, Montotube coil winding jig, safety valve. Finish brick laying in shop. Finish steam engine proposal. Misc: Debit card activation, sky...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Jan 26th: Complete boiler research: Feed Pump, Montotube coil winding jig, safety valve. Finish brick laying in shop. Finish steam engine proposal. Misc: Debit card activation, skype account, Explorer showing. Time Organization program: Need linked in program. Jan 27th: Complete Steam pump and Lathe BOM post and post steam engine proposal.

  	   Frame inside of Shop kitchen.

Jan 28th: Get quote of materials from Sweigers: Insulate shop and get sheet rock.

Jan 29th: Order steam engine and lathe materials. Post final dwgs of mechanical engine, boiler, and layout. Jan 30th: Research steam engine solenoid specs, post and locate. Sheet rock shop space, drill in shower outlet fire boiler. Jan 30th: Work on shop try to get liveable cookeable space.

Feb 1st: Rest

Feb 2nd: Begin steam engine work upon reciveing materials:

1 week Boiler and auxilaries, safety valve, feed pumps, draft control.

2nd week February: Engine construction. Bore cylinder set piston rings, assemble stuffing box,

3rd week of February: Lower Crank Assembly, fire up system possibly by the end of the week.