Factor e Farm Infrastructure Buildout 2011 Budget
Jump to navigation
Jump to search
Actual
- 4 Milwaukee cordless drills – total dollars 407
- Roof metal - 136 panels, 17' long (3' widths) - 108 for workshop, 22 for material shed, and 6 extra + flashing for clerestory + screws + flashing closure – total dollars 5871
- 2x6 lumber, 6.60 - total 396 pieces - total dollars 2802
- Glue, #25 star driver bits, 3" star bit screws, 2 glue guns, furring strips, 2 tie downs – total dollars 299
- Trailer rental for lumber – total dollars 47
- Gravel receipt for OSE Shop 2011 - 5000 sq ft of 6" deep plus 4x4x3' pillar bases - $2703 (Shop Gravel Receipt)