XM Fabrication Optimization

From Open Source Ecology
Revision as of 02:48, 12 March 2012 by Marcin (talk | contribs) (→‎Fabrication Optimization Checklist)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Scenarios

Fabrication optimization can occur at the prototyping phase or production phase. In the scenario of flexible, digital fabrication - the difference between prototyping and production should be minimal.

Fabrication Optimization Checklist

  • CAD files and 3D models are examined for fabrication pathway
  • XM Fabrication Procedure using generally-available tooling is suggested prior to the working prototype build
  • Fabricator assesses available tools, and together with XM Scrum Master, suggestions are made for tooling up with additional tools to make prototyping more effective