Preparation

Change Notes

Design Modifications

  • Based on modular rear hopper supports, add quick attach to front hopper supports as well
    • Shorten horizontal frame u-channels from 22" by 1.5" - to allow for the front hopper support to be mounted on the primary arms
  • Simplify shaker shield to a single flat plate
  • Add a more robust, modular holding mechanism for sensors
  • Add safety disconnect for machine turn-off
  • Can we get a better packing fraction on Part 24 of CEB IV Master Index?
  • Shorten rail by 2" at the front of the machine, leave hanging 8" beyond drawer chamber at the rear.
    • Use 1"x3" bar instead of 1/2"x3 (or 1/2"x5/8") and 1/2"x2"
  • Lengthen hinges to 34" for the hopper and 24" for the grate supports
  • Reduce bottom pin bushings from 1.8" to 1.5"
  • Make bushing for bottom cylinder mount to frame the same as the end tube - 1.5"x2.5" DOM tubing - to reduce material list
  • Remove bolt holes for back of hopper supports (shaker side) and clamp instead on top with 1/2"x6" flat.

Fabrication Drawing Corrections

  • Fab Drawing (Part) #151: Correct spelling of Brake
  • Part #153 & #154: change wall thickness from 1/2" to 1/4"
  • Part #90: update to heavier hinge. Punching holes is preferred to drilling. Update length to not drill.

Fabrication Diagrams

Master Fabrication PDF

Master Index

edit

Fabrication Abstract

Build all parts from raw material. Team 1: hopper sheet metal cutting with 2 plasma cutters, hinge cutting to size with ironworker, punching of holes with hinge put in place on front and back hopper sheets. Team 2: does all cover plate sheet metal. Team 3: Ironworker team does pieces and holepunches them. grate fab after 1/4x2s and angle pieces are sheared on ironworker. Team 4: Cold cut team. Team 5: Bandsaw Team for 2.5"x3/16" tubing. Cuts metal for drawer at same time.

edit

Optimization Abstract

Hole puncher needs to have operability by 1 person with a well-positioned valve. 2 plasma cutters need to be in place. 4 welders need to be available. 2 acetylene torches should be available. CNC torch table will get hopper fab down to 1/2 hour for cutting. CNC torch table will optimize metal cutting for drawer and frame. Ironworker needs to be upgraded to handle 1/2"x4"x6" angle.

Hopper + Grate

Steps

  1. Mark and plasma cut sheet metal
  2. Cut hinge
  3. Mark and tack hinge to side plates
  4. Match holepunch with 3/4" bit
  5. Weld nuts on the back of rear and front hopper sheets
  6. Assemble and clamp bolted on sheets - permanent weld to side sheets
  7. Grind off tacks and bolt through

edit

Main Cylinder Fabrication Diagram

edit

Frame

edit

Drawer + Drawer Rollers

Procedure

  • Shear all metal on ironworker
    • [3] 1/2"x5"x6"
    • [4] 1/2"x3"x5"
    • [4] 1/2"x3"x3"

edit

Hopper Shaker

edit

Hydraulics

edit

Arms + Legs

edit