CEB Prototype 1 Fab

From Open Source Ecology
Revision as of 21:10, 18 January 2008 by WikiSysop (talk | contribs) (New page: Here are most of the details for fabricating CEB Prototype 1. We start with raw metal. Drill holes in the structure pieces, 7/16" x 6 inch u-channel: Image:1_cebfab.jpg Begin putting ...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Here are most of the details for fabricating CEB Prototype 1.

We start with raw metal. Drill holes in the structure pieces, 7/16" x 6 inch u-channel: 1 cebfab.jpg Begin putting the frame together: 2 cebfab.jpg Use 1/2", grade 8 bolts, and the frame is complete: 3 cebfab.jpg Cut Nylon 6/6 liner to size, and use it for abrasion resistance for the compression chamber: 4 cebfab.jpg Install the Nylon liner in the compression chamber: 5 cebfab.jpg Add the plate for the compression chamber box, with the Nylon underneath: 6 cebfab.jpg Put in spacers for the bottom of the frame, as the 5 inch cylinder that we used was fatter than 6 inches of the frame width: 7 cebfab.jpg Assemble and stand the machine: 1 cebfab.jpg