CEB Prototype 1 Fab

From Open Source Ecology
Revision as of 21:21, 18 January 2008 by WikiSysop (talk | contribs)
Jump to navigation Jump to search

Here are most of the details for fabricating CEB Prototype 1.

We start with raw metal. Drill holes in the structure pieces, 7/16" x 6 inch u-channel:

1 cebfab.jpg

Begin putting the frame together:

2 cebfab.jpg

Use 1/2", grade 8 bolts, and the frame is complete:

3 cebfab.jpg

Cut Nylon 6/6 liner to size, and use it for abrasion resistance for the compression chamber:

4 cebfab.jpg

Install the Nylon liner in the compression chamber:

5 cebfab.jpg

Add the plate for the compression chamber box, with the Nylon underneath:

6 cebfab.jpg

Put in spacers for the bottom of the frame, as the 5 inch cylinder that we used was fatter than 6 inches of the frame width:

7 cebfab.jpg

Assemble and stand the machine:

http://www.youtube.com/v/HAA--hZMqIA

src="http://www.youtube.com/v/HAA--hZMqIA" type="application/x-shockwave-flash" width="425" height="350"> </embed> </object>