CEB Prototype 1 Fab
Here are most of the details for fabricating CEB Prototype 1.
We start with raw metal. Drill holes in the structure pieces, 7/16" x 6 inch u-channel:
Begin putting the frame together:
Use 1/2", grade 8 bolts, and the frame is complete:
Cut Nylon 6/6 liner to size, and use it for abrasion resistance for the compression chamber:
Install the Nylon liner in the compression chamber:
Add the plate for the compression chamber box, with the Nylon underneath:
Put in spacers for the bottom of the frame, as the 5 inch cylinder that we used was fatter than 6 inches of the frame width:
Assemble and stand the machine:
<object width="425" height="350"> <param name="movie" value="http://www.youtube.com/v/HAA--hZMqIA"> </param> <embed src="http://www.youtube.com/v/HAA--hZMqIA" type="application/x-shockwave-flash" width="425" height="350"> </embed> </object>
Take out the acetylene torch:
And slice up metal pieces for the pressing plate:
Grind and prepare pressing plate assembly:
<object width="425" height="350"> <param name="movie" value="http://www.youtube.com/v/PTbdqzi1zZM"> </param> <embed src="http://www.youtube.com/v/PTbdqzi1zZM" type="application/x-shockwave-flash" width="425" height="350"> </embed> </object>
We used a 20 kW tractor power-take-off (PTO) genearator to feed the welder.
Here is the prepared pressing plate assembly with cylinder pin:
Add the 5 inch, 2.5 inch rod, ~20 ton hydraulic cylinder:
Fit the pressing plate assembly on the cylinder:
Prepare sides of the compression plate, so the compression plate assembly moves straight vertically:
<object width="425" height="350"> <param name="movie" value="http://www.youtube.com/v/HOlk4SH5aK8"> </param> <embed src="http://www.youtube.com/v/HOlk4SH5aK8" type="application/x-shockwave-flash" width="425" height="350"> </embed> </object>
Here is the finished press plate and cylinder mount before assembly:
Here is the assembled press plate, with rubber liner on top:
Note how the two pieces are bolted together:
Now we fit the compression box assembly in the frame, attach the cylinder and hydraulics, and test motion of the cylinder:
<object width="425" height="350"> <param name="movie" value="http://www.youtube.com/v/2AF6h-WaFI0"> </param> <embed src="http://www.youtube.com/v/2AF6h-WaFI0" type="application/x-shockwave-flash" width="425" height="350"> </embed> </object>
Now we fit the cylinder and press plate into the frame:
We close up the compression box:
Here we show other details of mounting the cylinder in the frame:
<object width="425" height="350"> <param name="movie" value="http://www.youtube.com/v/ETig2zgpdD8"> </param> <embed src="http://www.youtube.com/v/ETig2zgpdD8" type="application/x-shockwave-flash" width="425" height="350"> </embed> </object>
Thy cylinder is mounted and the pin holder is ready for welding:
Winter came, so we moved operations into the greenhouse:
We attached the hopper table to the frame:
And we are ready to test the pressing of the first brick:
We filled the compression chamber with soil:
We covered the latch, and fixed it in place (not shown):
And we pressed the first brick:
Here is the first block ejected:
<object width="425" height="350"> <param name="movie" value="http://www.youtube.com/v/VIi_4cX0M2E"> </param> <embed src="http://www.youtube.com/v/VIi_4cX0M2E" type="application/x-shockwave-flash" width="425" height="350"> </embed> </object>
We show the block and the earth it's made from:
Next comes the hopper assembly. Here is the hopper cylinder:
Here is the liner for the hopper table:
Here is the hopper assembly in the making. Soil enters the compression chamber through the hole in the bottom plate:
And here is the finished hopper assembly, ready for testing:
We gather a pile of semi-frozen dirt:
And pack the compression chamber, first manually:
Then we fill the hopper. The soil was too wet, but here are some sample bricks:
<object width="425" height="350"> <param name="movie" value="http://www.youtube.com/v/WmKj9D3enpM"> </param> <embed src="http://www.youtube.com/v/WmKj9D3enpM" type="application/x-shockwave-flash" width="425" height="350"> </embed> </object>
And that's it for Phase 1. Now we'll be testing the machine and building an improved prototype with an XYZ torch table to facilitate metal preparation.