OSE Design Sprint Status and Needs
Jump to navigation
Jump to search
We want to create icons - such that each icon is matched with a clear series of steps that need to be taken to execute on a given step.
This would be a google drawing - with rearrangeable icons - a visual status infographic, which could reveal a 'visual burndown graph' based on the modules changing color.