Nov-Dec Video Production Plan

From Open Source Ecology
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Review of prior 10 weeks after Focus Forward month: 7 total of 15 videos stated in contract.
  • 3rd week of November (this week): Trencher video edit - published Thursday (today?). Focus Forward published instead. Major hit..
  • 4th week: Shuttleworth Application video edit - this needs to be top notch - a quarter million is at stake here. CEB Press Production Run 2 - Nov, 23-24. Trencher video published. Taking of CEB Production Run Footage.
  • 5th week: Power Cube Production Run video edit. Nov 30-Dec 1 - Backhoe production run shooting. Not. Shuttleworth Video deadline by Wednesday.
  • November Instructional 1: Power Cube assembly video. (4 hours with Parker). Can we get Parker to do the actual wrenching? I am pressed for the CEB Press production run prep + Backhoe Production Run prep, and after that I need to go down periscope on prep for CEB Dec 18 - if we are to deliver the 1DAY production run. This is big.
  • November Instructional 2: CNC Torch Table Controller + Mechanical Structure fabrication. Some video available on YouTube.
  • 1st week of December: Backhoe production run video edit.
  • 2nd week of December: 2nd video edit based on Focus Forward footage
  • 3rd week of December: CEB Press Production Run video edit. Not instructional, but story-telling on the event. CEB production run shooting Dec 18.
  • 4th week of December: Vacation
  • December Instructional 1: CEB Press disassembly edit (2 hours with 4 people). Instructional on assembly + footage of actual build from the 2 CEB production runs.
  • December Instructional 2: Step-by-step instructional of CEB Press Controller Fabrication
  • 1st week of January (Dec 31-Jan 4):
  • 2nd week of January (Jan 7-Jan 11):
  • 3rd week of January (Jan 14-18):
  • January Instructional 1: CEB Construction of Microhouse. Technique and procedure. Ted is currently working on the work plan, but if this does not happen, I would like you to do another video on the quick connect wheel units.

Videos should be about 5 min each generally, except for CEB press. The instructionals absolutely require a script.