Bulldozer/Manufacturing Instructions

From Open Source Ecology
Jump to: navigation, search

Modules

Cab

edit cab

valves

four 4x16 plates from warehouse


two copies for 6 spool joystick valve

drill two holes

Screencap-valvemount1.png


one of each for 2 spool valve

  • torch corner
  • drill one hole

Screencap-valvemount2.png

  • torch corner
  • drill two holes

Screencap-valvemount3.png

Bed

edit truck


Under side

Parts

  • 4x4
    • 4 80"
    • 2 72"
  • 8 Hinge Plates
  • 2 QA mounts
    • 2 QD-SDS
    • 2 11T
  • 2 Geardown modules
    • 2 45T
    • 1 Wheel mount
    • 1 Wheel

  1. space the 72" 4x4s 80" apart
  2. set two of the 80" 4x4s at either end of th 72" 4x4s
  3. bolt corners together
  4. set two 80" 4x4s 4inches inward from the first two
  5. bolt together

  1. place four of the hinge plates on the outer verticle face of the 72" 4x4s
  2. bolt together
  3. repeat on opposite 72"

  1. mount quick attach wheel module 12inches from from the front of the left side 80" 4x4s
  2. mout geardown module 8inches from quick attach wheel module
  3. on opposite side mount the quick attach wheel module 44inches from the front
  4. mount the geardown module 8inches in front of the quick attach wheel module

  1. install the pivot shaft

Wheels

Groundhug Pivot

Pivot [15/15]

edit [1/15]


edit [2/15]


edit [3/15]


edit [4/15]


edit [5/15]


edit [6/15]


edit [7/15]


edit [8/15]


edit [9/15]


edit [10/15]


edit [11/15]


edit [12/15]


edit [13/15]


edit [14/15]


[hhttps://docs.google.com/drawings/d/1PDAAI5VU0yzOSPryHIP4LIw9cJiHpm8M2vGIM04-_Sg/edit edit] [15/15]

Loader

Arms

Loader Arm Module Assembly

Quick Attach

edit

Blade

Dozer Blade Assembly


Powercube [5/5]

File:Powercube Complete 062413.skp


edit [1/5]


edit [2/5]


edit [3/5]


edit [4/5]


edit [5/5]

Hydraulics

in process. comments encouraged in the talk section. Talk:Bulldozer/Manufacturing_Instructions#Hydraulics

edit