Bulldozer/Manufacturing Instructions
Contents
Modules
Cab
valves
four 4x16 plates from warehouse
two copies for 6 spool joystick valve
drill two holes
one of each for 2 spool valve
- torch corner
- drill one hole
- torch corner
- drill two holes
Bed
Under side
Parts
- 4x4
- 4 80"
- 2 72"
- 8 Hinge Plates
- 2 QA mounts
- 2 QD-SDS
- 2 11T
- 2 Geardown modules
- 2 45T
- 1 Wheel mount
- 1 Wheel
- space the 72" 4x4s 80" apart
- set two of the 80" 4x4s at either end of th 72" 4x4s
- bolt corners together
- set two 80" 4x4s 4inches inward from the first two
- bolt together
- place four of the hinge plates on the outer verticle face of the 72" 4x4s
- bolt together
- repeat on opposite 72"
- mount quick attach wheel module 12inches from from the front of the left side 80" 4x4s
- mout geardown module 8inches from quick attach wheel module
- on opposite side mount the quick attach wheel module 44inches from the front
- mount the geardown module 8inches in front of the quick attach wheel module
- install the pivot shaft
Wheels
Groundhug Pivot
Pivot [15/15]
edit [1/15]
edit [2/15]
edit [3/15]
edit [4/15]
edit [5/15]
edit [6/15]
edit [7/15]
edit [8/15]
edit [9/15]
edit [10/15]
edit [11/15]
edit [12/15]
edit [13/15]
edit [14/15]
[hhttps://docs.google.com/drawings/d/1PDAAI5VU0yzOSPryHIP4LIw9cJiHpm8M2vGIM04-_Sg/edit edit] [15/15]
Loader
Arms
Quick Attach
Blade
Powercube [5/5]
File:Powercube Complete 062413.skp
edit [1/5]
edit [2/5]
edit [3/5]
edit [4/5]
edit [5/5]
Hydraulics
in process. comments encouraged in the talk section. Talk:Bulldozer/Manufacturing_Instructions#Hydraulics