CEB Press Development Hours

From Open Source Ecology
Jump to: navigation, search
  • Prototype builds - 20 weeks * 40/week = 800
  • Final builds - 40*12 a= 480 hours
  • Runtime - 16*8 + 50 for the first = 180 hours
  • Design - 320+320+80
  • Documentation - 480 (2014) + 160 + 160
  • Soil pulverizer - 320
  • Soil mixer - 160
  • Tractor - 800
  • Power Cube - 800
  • Documented total - ~4910 hours.

Method 2

  • 1 full year person (minimum) per CEB, tractor, power cube - 6000 hours