Financial Indpendence Package Intake Form

From Open Source Ecology
Jump to navigation Jump to search

Thank you for your interest in the Financial Independence Package. This form helps us understand your goals, your build site, and your readiness for a house delivery and build. Please answer as completely as possible. Once we review your submission, we will schedule a call with you.

Section 1 – Contact Information

  • Full Name
  • Email
  • Phone
  • City, State/Province, Country
  • Preferred Communication Method (Phone, Email, Text, WhatsApp, Other)

Section 2 – Your Land and Build Site

  • Do you currently own land? (Yes / No / Under Contract / Searching)
  • Land Address or General Location (if owned)
  • Zoning Type (Residential / Agricultural / Rural / Other / Unknown)
  • Approximate Acreage
  • Terrain & Access Notes (flat/hilly, trees, driveway length, slope, etc.)
  • Are there building codes in your area? (Yes / No / Unsure)
  • How do you plan to classify your structure?
    • Primary Residence
    • ADU
    • Farm Building
    • Barn / Ag Exempt
    • Other / Not sure yet
  • Have you spoken with your local building department yet? (Yes / No / Scheduled / Not yet but will)

Section 3 – Permitting & Building Department Requirements

  • What permits are required in your jurisdiction? (check all that apply)
    • Building Permit
    • Zoning / Land Use
    • Septic / Wastewater
    • Well / Water Access
    • Driveway / Access
    • Electrical Permit
    • Plumbing Permit
    • Mechanical / HVAC Permit
    • Other / Unknown
  • Which parties are required on a permit in your area? (check all that apply)
    • Owner-Builder Allowed
    • General Contractor Required
    • Licensed Electrician Required
    • Licensed Plumber Required
    • Licensed HVAC Required
    • Engineer / Architect Stamps Required
    • Not yet determined
  • What inspections are required? (framing, foundation, electrical, plumbing, mechanical, final, etc.)
  • Does your jurisdiction allow owner-builder construction? (Yes / No / Unsure)

Section 4 – Delivery & Site Equipment

  • Do you have (or will you have) a way to unload modular sections from a trailer?
    • Telehandler
    • Forklift
    • Crane
    • Tractor with forks
    • Will rent equipment
    • Not sure yet
  • Is there access for a semi-truck and/or 40–50 ft trailer to reach your build site? (Yes / No / Unsure)
  • Are there overhead wires, sharp turns, bridges, or other delivery challenges? (describe)

Section 5 – Utilities & Site Infrastructure

  • Water Source (Well / City / Haul-in / Other / Unknown)
  • Wastewater (Septic / Sewer / Compost / Unknown)
  • Power (Grid / Off-grid / Hybrid)
  • Do you want help with electrical, plumbing, and HVAC installation? (Yes / No / Maybe)
  • Target installation timeline (1–3 months / 3–6 months / 6–12 months / 1 year+)

Section 6 – Your Goals & Readiness

  • What is your main motivation?
    • Financial independence
    • Debt-free housing
    • Homestead / land freedom
    • Off-grid independence
    • Family legacy
    • Other
  • When would you ideally like to start building?
  • How soon are you ready to place a deposit if accepted?
    • Immediately
    • 1–3 months
    • 3–6 months
    • 6–12 months
  • Any questions, concerns, or notes?