Interior Wall Build Process

From Open Source Ecology
Jump to navigation Jump to search
  1. Wall Interior 1 - foundation 3" PVC stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1. Subfloor is drilled digitally for connection to module 4.