Jonathan Prusa i3 Build
From Open Source Ecology
Module 1
- [12] l brackets.
- [24] set screws
- [14] m4 Tnuts
- [8] m5 Tnuts
- [6] small washers - note that they should be larger as they fall through.
- [4] square blocks
- [2] rounded blocks
- [6] corner brackets
- [2] shortest smooth rods
- [2] longest smooth rods
- [1]
- Larger washers
- [4] m4x14 bolts for rounded blocks
- [6] m4x8 panhead bolts for idler and power supply
- 5:54 to put in the set to set screws. Definitely needs to use technique.
- Forgot to add the vertical l-brackets - was taken apart.
- 58 minutes to the idler. Exactly 2x over optimum time.
Module 2 - Extruder Carriage
- [7] bearings
- [6] zip ties
- [3] 3D printed pieces
- [1] stepper motor
- [1] pulley
- [2] bearings
- [1] m3x16
- [3] m3x20
- [3] lock washers
- 23:10 for time - :50 over world record
Module 3 - Z Motors
- [4] m4x8 panhead screws
- [4] m4 t nuts
- [2] steppers
- [2] plexiglas faces
- [2] couplers
- [2] motor brackets
- [8] m3x12 panhead screws
- [8] m3 lock washers
- 9:20 - 30 seconds over the 8:50 olympic record.
Module 4 - Heat Bed
- [2] 16 gauge wires
- [1] thermistor
- [2] 7" red wire
- [2] 7" black wire
- [3] bearings
- [3] bearing holders
- [1] belt holder
- [6] m3x20 pan head screws
- [2] m3x12 pan head screws
- [4] springs
- [4] thumb screws
- [4] m3x16 pan head screws
- [8] m3 lock nuts
- 14:10 for electronic solder + wiring.
- Ream out the plastic piece holes
- 43:22, or 29:12 if parallel cf 27:30.
Module 5 - Bed Motor
- [1] large motor
- [1] pulley
- [1] bracket
- [2] m4x8 panhead srews
- [4] m3x8 panhead
- [4] lock washers
- 5:45 cf 3:45. OT on looking for screws.
Module 6 - End Stops
- [3] stop holders
- [3] end stop electronics
- [5] 3mm lock nuts
- [2] 3x8 mm cap head screw
- [3] 3x20 mm cap head screw
- 5 min of 3:30 world record
Module 7 - Extruder assy
- 14:40 using soldering iron for heatshrink. Beat the world record of 16:20.
Module 8 - Power Supply
- 19:39, beats the world record by one minute.
Module 9 - Controller
- [1] m4 t nut
- [1] m4x8 cap head
- [1] plexiglas mount
- [1] controller board
- [3] m3 lock washers
- [3] m3x25 cap head screws
- 3: 4:00 cf 3:00
Module 10 - Controller
- [4] stepper wires
- [3] endstop wires
- 17:30 cf 12:40, with several minutes wasted on doing combined bundle instead of separate.
- About 3:30 total.
Overall
- Heated bed bearings + rods - put them in before tightening bearing holders.
- 2:47, with 29 minutes on wiring.