Manual
Optimal Build Times
Top Time Consuming Parts
- Electronics Testing -
- Titan Aero - 45 min - 1 hr according to online manual - [1]
- Control Panel Predrilling
- Rod Cutting
Tooling
- Angle Grinder Chop Saw - [2]
- Hack saw - 3D printed
- 5 mm hex driver, #2 Philips, 3 mm flathead, #1 Philips
- Pliers, .4 mm needle for clogs
Replacement Parts
- Note that Micro Swiss appears to be higher quality even than E3D - [3] - is that so?
- 3 mm version - [4]
- E3D heat break - 1.75 mm - not cheap - [5]
- E3D heatbreak - 3 mm - not correct - threads are same size - [6]