Kit Build Manual

From Open Source Ecology
Jump to: navigation, search

Manual


Optimal Build Times

edit

Top Time Consuming Parts

  • Electronics Testing -
  • Titan Aero - 45 min - 1 hr according to online manual - [1]
  • Control Panel Predrilling
  • Rod Cutting

Tooling

  • Angle Grinder Chop Saw - [2]
  • Hack saw - 3D printed
  • 5 mm hex driver, #2 Philips, 3 mm flathead, #1 Philips
  • Pliers, .4 mm needle for clogs

Replacement Parts

  • Note that Micro Swiss appears to be higher quality even than E3D - [3] - is that so?
  • 3 mm version - [4]
  • E3D heat break - 1.75 mm - not cheap - [5]
  • E3D heatbreak - 3 mm - not correct - threads are same size - [6]

Improvements

  • 3 mm rod, 120 mm long - [7] - 82 cents
  • 3 mm rod - 100 mm long - [8] - 50 cents

Links