Lean Six Sigma
About
https://en.wikipedia.org/wiki/Lean_Six_Sigma (LSS)
DOWNTIME is an acronym in LSS representing 8 forms of waste. Defects. Overproduction. Waiting. Transportation. Non-used talent, Inventory. Motion. Extra processing.
Here are some useful icons [1]:
Kaizen (Continuous Improvement) vs Six Sigma
| Kaizen | Six Sigma |
|---|---|
| Continuous small improvements (everyday change) | Structured, project-based defect and variation reduction |
| Everyone participates; frontline-driven | Typically led by trained roles (Green/Black Belts) with executive sponsorship |
| Cultural mindset and habits; improvement as part of daily work | Methodology with defined phases and deliverables (DMAIC/DMADV) |
| Fast experimentation; “try, learn, standardize” | Data- and analysis-intensive; statistical tools common |
| Focus: flow, waste reduction, work standardization, ergonomics | Focus: variation control, capability, defect reduction (DPMO, sigma level) |
| Measurement: simple operational metrics (lead time, WIP, rework, safety) | Measurement: process capability, control charts, hypothesis tests, DOE |
| Best for: high-frequency opportunities, local process improvements | Best for: chronic quality problems, complex cross-functional processes |
| Typical cadence: daily/weekly improvements; occasional Kaizen events | Typical cadence: defined projects lasting weeks to months |
5S Method for Clean Organization
| Japanese | English | Operational meaning | Audit checklist (yes/no or score 0–2 each) |
|---|---|---|---|
| Seiri | Sort | Remove unnecessary items from the workspace |
|
| Seiton | Set in Order | Arrange needed items for efficient access |
|
| Seiso | Shine | Clean and inspect the workspace |
|
| Seiketsu | Standardize | Establish procedures to maintain first 3 S’s |
|
| Shitsuke | Sustain | Build discipline and habit to keep standards |
|
Visual Workshop and Organization Master List
Source - [2]
1. Visual Control Foundations
Workspace Zoning
- Floor tape color-coded zones (materials staging, finished goods, scrap, WIP)
- Defined walkways with safety yellow lines
- “No-storage” red hash zones
- Forklift travel lanes
- Visitor safe zones
Tool Visibility
- Shadow boards (outlined tool shapes)
- Tool ID numbers engraved or labeled
- Dedicated location for every tool
- Tool checkout board (shared tools)
- Missing tool indicator flags
Labeling System
- Standard label format (font, size, color)
- Label every shelf, drawer, bin, cabinet
- QR codes for procedures or manuals
- Laminated large-format zone labels
- Material category color coding
2. 5S Infrastructure
Sort Systems
- Red tag area
- Red tag log sheet
- Quarterly purge schedule
- Obsolete material quarantine zone
Set in Order
- Fast-mover tools closest to point of use
- Min/max bins with visual fill lines
- Consumable Kanban cards
- Drawer dividers with silhouettes
- Standard fastener racks with size labeling
Shine
- Cleaning stations at each zone
- Color-coded cleaning tools by area
- Daily 5-minute cleanup standard
- Equipment wipe-down checklist
- “Clean-to-inspect” lighting
Standardize
- Photo standard boards (“what good looks like”)
- Area ownership board
- Posted restock standards
- Visual SOP sheets at workstation
Sustain
- 5S audit board with scoring
- Monthly audit calendar
- Improvement idea board
- Before/after photo board
3. Flow and Production Visibility
Workflow Visualization
- Value stream map posted
- Production flow arrows on floor
- Job travelers clipped to work
- Build status board (To Do / Doing / Done)
- Daily production target board
Bottleneck Visibility
- WIP limit signs
- Queue size max lines marked
- “Blocked” red tag cards
- Downtime reason board
Scheduling and Planning
- Weekly lookahead board
- Takt time clock display
- Visual daily huddle board
- Material pull board
4. Safety Visual Systems
- PPE required signage by zone
- Machine hazard labeling
- Emergency exits clearly marked
- Fire extinguisher locations outlined
- First aid station marked with stocked indicator
- Lockout/tagout station with tags visible
- Safety cross board (days since incident)
5. Quality at the Source
- First-piece approval board
- Sample “gold standard” parts displayed
- Inspection checkpoints marked
- Error-proofing (poka-yoke) fixtures
- Go/No-Go gauges visibly mounted
- Defect board with root cause tracking
- Calibration due-date tags on tools
6. Material and Inventory Control
- FIFO lanes marked
- Date stickers on inventory
- Raw vs finished goods zones separated
- Scrap bin clearly marked and isolated
- Supplier label standard
- Material staging racks at point of use
- Reorder point visual cards
7. Equipment Management
- Preventive maintenance board
- Machine status lights (green/yellow/red)
- Tool life tracker (drill bits, blades)
- Spare parts shadow board
- Maintenance log posted at machine
8. Communication and Leadership
- Gemba walk board
- Improvement tracking board
- Suggestion box (physical or digital)
- KPI wall (Safety / Quality / Delivery / Cost / Morale)
- Escalation ladder posted (who to call, in what order, with response times)
- Leadership standard work posted
9. Advanced Visual Systems
- Andon lights
- Digital dashboard screens
- RFID tool tracking for check-in/out and location-at-last-scan
- Barcode material tracking
- Visual torque verification marks
- Laser-projected layout guides
- Smart Kanban bins
- Electronic traveler system
10. Cultural Visual Reinforcement
- “Before and After” improvement wall
- Skill matrix board
- Training progress board
- Certification badges
- Core values display
- Improvement wins highlight board
Implementation Sequencing
- 5S foundation
- Workflow visibility
- Quality and safety reinforcement
- Material control systems
- Advanced automation and digital visual controls
Design Rule
Every visual system should answer at least one question immediately:
- What is supposed to happen?
- What is happening now?
- Is there a gap?
- Who owns the gap?
- What is the next action?
Gemba Walk
A Gemba Walk is a structured leadership practice where managers go to the actual workplace (shop floor, job site, lab, office) to:
- Observe the process directly
- Ask questions
- Understand problems firsthand
- Support continuous improvement
| Section | What to observe / ask | Evidence to capture | Rating (0–2) |
|---|---|---|---|
| Walk setup |
|
|
0–2 |
| Safety |
|
|
0–2 |
| Quality at the source |
|
|
0–2 |
| Flow and bottlenecks |
|
|
0–2 |
| Standard work adherence |
|
|
0–2 |
| 5S and visual management |
|
|
0–2 |
| Materials and logistics |
|
|
0–2 |
| Equipment and uptime |
|
|
0–2 |
| People, training, and engagement |
|
|
0–2 |
| Problem solving and follow-up |
|
|
0–2 |
| Closeout |
|
|
0–2 |
Scoring suggestion: 0 = not in place / concerning; 1 = partially in place; 2 = consistently in place. Capture 3–5 actionable items per walk and review closure on the next walk.
Visual Workshop Implementation Template
| Visual Workshop item | Implementation procedure (minimum viable steps) | Effort (labor) | Material cost (USD, typical) |
|---|---|---|---|
| Floor tape color-coded zones (staging, WIP, finished, scrap) | 1) Sketch current layout and define zones 2) Assign color standard and publish legend 3) Sweep/degrease floors 4) Tape/paint boundaries and zone labels 5) Train crew on “what belongs where” |
4–12 hrs | $300–$1,200 (tape/paint, labels) |
| Defined walkways + “no-storage” red hash zones | 1) Identify primary travel routes and pinch points 2) Mark walkways (yellow) and no-storage areas (red hash) 3) Post enforcement rule (“nothing stored here”) 4) Audit daily for first 2 weeks |
2–8 hrs | $100–$600 |
| Forklift lanes and pedestrian separation | 1) Map forklift routes and crossings 2) Mark lanes, crossings, and stop points 3) Add mirrors/signage at blind corners 4) Brief all personnel; enforce right-of-way rule |
4–10 hrs | $200–$1,500 (tape, signs, mirrors, bollards optional) |
| Visitor safe zones | 1) Define visitor paths and viewing areas 2) Mark “visitor only” zones and barriers 3) Post PPE rules and escort requirement |
1–3 hrs | $50–$300 |
| Shadow boards (tool outlines) at point of use | 1) Inventory tools per station 2) Mount board and hooks 3) Place tools and trace outlines (paint/vinyl) 4) Label homes; add “missing tool” indicator 5) Standard: tools returned end-of-task |
2–6 hrs per board | $80–$250 per board |
| Tool ID numbers (engraved/labeled) + master tool list | 1) Assign unique IDs (format: TOOL-###) 2) Label/engrave tools 3) Create master list (ID, type, home, owner/crib) 4) Update process for new tools and retirements |
4–12 hrs (initial) | $50–$400 (labels/engraver consumables) |
| Dedicated “home” for every tool (drawers, hooks, bins) | 1) Define storage topology per station 2) Add dividers/foam silhouettes where needed 3) Label each location (same naming convention) 4) Remove duplicates/unused tools to overflow storage |
6–20 hrs (shop-wide) | $150–$1,500 (dividers/foam/containers) |
| Tool checkout board (shared tools) | 1) Define which tools require checkout 2) Create physical board (magnet tags/cards) or digital log 3) Rule: no tool leaves crib without checkout 4) Weekly review of chronic holdouts |
3–8 hrs | $50–$300 |
| Missing tool indicator flags (visual abnormality) | 1) Add a flag/placeholder for each tool home 2) Flag visible when tool absent 3) End-of-day “all flags cleared” check |
1–3 hrs per station | $10–$80 per station |
| Labeling standard (font, size, color, format) | 1) Define label conventions (Area–Rack–Shelf–Bin) 2) Choose printer + label stock 3) Publish style sheet and examples 4) Enforce: no unlabeled storage |
2–6 hrs | $200–$700 (printer + labels) |
| Label every shelf/drawer/bin/cabinet | 1) Walk the shop and inventory storage points 2) Print/apply labels systematically by zone 3) Add QR codes only where SOPs exist 4) Weekly “label drift” correction |
6–24 hrs (shop-wide) | $50–$400 (labels) |
| QR codes for procedures/manuals (optional) | 1) Create SOP pages (PDF/wiki) with stable URLs 2) Generate QR labels and place at point-of-use 3) Test with phones; fix broken links 4) Update SOP revision control |
4–16 hrs | $20–$200 |
| Material category color coding (labels/bins) | 1) Define categories (fasteners, electrical, plumbing, adhesives, etc.) 2) Assign colors and publish legend 3) Apply colored tape/labels consistently 4) Audit mis-sorts weekly |
4–12 hrs | $50–$400 |
| Red tag area (Sort) + quarantine zone | 1) Allocate a clearly marked red-tag zone 2) Create red-tag cards + log sheet 3) Run a 2-hour “sort blitz” per area 4) Set disposal/relocation rule at 30 days |
4–12 hrs (initial) | $25–$150 |
| Quarterly purge schedule (Sort sustainment) | 1) Put purge weeks on calendar (quarterly) 2) Assign area owners to execute 3) Record volume removed and reclaimed space 4) Adjust min/max to prevent re-accumulation |
1–2 hrs/month ongoing | $0–$50 |
| Fast-mover tools/materials closest to point of use | 1) Identify top 20 frequently used items per station 2) Relocate to point-of-use storage 3) Push slow movers to secondary storage 4) Validate: retrieval <30 seconds |
4–10 hrs | $0–$400 (bins/racks if needed) |
| Min/max bins with fill lines | 1) Select consumables to control (top 20–50) 2) Set min/max levels based on usage cadence 3) Add fill lines and reorder trigger cards 4) Assign restock owner + daily check |
6–16 hrs | $100–$600 |
| Consumable Kanban cards | 1) Create Kanban cards (item, part #, reorder qty, supplier) 2) Place at min level in bin 3) Define “card goes to order box” process 4) Weekly audit for stockouts |
4–12 hrs | $25–$200 |
| Drawer dividers / foam cutouts for tools | 1) Select drawers with chronic mess/searching 2) Design layout; cut foam or insert dividers 3) Label each cavity/slot 4) Enforce return-to-home standard |
1–4 hrs per drawer | $30–$150 per drawer |
| Standard fastener racks with size labeling | 1) Standardize fastener SKUs (reduce variety) 2) Install rack/bins and label each size 3) Add min/max and reorder triggers 4) Remove mixed “coffee can” storage |
6–16 hrs | $200–$1,500 |
| Cleaning stations (brooms/rags/chemicals) by zone | 1) Define cleaning tool set per zone 2) Mount racks and label homes 3) Post “end-of-shift 5 minutes” standard 4) Assign zone owner for compliance |
2–6 hrs per station | $150–$500 per station |
| Color-coded cleaning tools by area (cross-contamination control) | 1) Assign color per area (bath, food, finish, general) 2) Purchase matching tools 3) Label station and enforce “no mixing” |
1–2 hrs | $50–$250 |
| Equipment wipe-down checklist (clean-to-inspect) | 1) Identify machines requiring daily/weekly wipe-down 2) Create laminated checklist at machine 3) Add sign-off and escalation for abnormalities |
2–8 hrs | $10–$80 |
| “Clean-to-inspect” lighting improvements | 1) Identify inspection/precision work areas 2) Add task lighting and glare control 3) Validate visibility for defects/leaks |
2–6 hrs | $50–$600 per area |
| Photo standard boards (“what good looks like”) | 1) Photograph ideal setups (before/after, tool wall, staging) 2) Print/laminate and post at station 3) Include 3–5 “do not” photos for clarity |
4–12 hrs | $50–$300 |
| Area ownership board | 1) Divide shop into named zones 2) Assign owners (name + backup) 3) Post responsibilities (5S, restock, safety checks) 4) Review weekly |
1–3 hrs | $20–$150 |
| Visual SOP sheets at workstation | 1) Identify repetitive tasks (top 10) 2) Write 1-page SOP with photos + critical dims 3) Laminate and mount at point-of-use 4) Revision control (date/version) |
1–4 hrs per SOP | $5–$20 per SOP |
| 5S audit board with scoring | 1) Define audit checklist and scoring (0–2) 2) Post board by zones 3) Schedule weekly audits 4) Track trends and close actions |
3–8 hrs setup; 1–2 hrs/week | $50–$250 |
| Monthly audit calendar | 1) Publish audit schedule (who audits what, when) 2) Post on wall near huddle board 3) Enforce: missed audits are visible |
1 hr | $0–$20 |
| Improvement idea board + suggestion box | 1) Create simple capture format (problem, idea, owner, date) 2) Place physical box or QR intake form 3) Review weekly; move ideas to action log |
2–6 hrs setup; 30–60 min/week | $20–$200 |
| Before/after photo wall | 1) Take baseline photos of key areas 2) Post improvements with date + owner + result metric 3) Refresh monthly to reinforce culture |
2–6 hrs setup; ongoing small | $20–$150 |
| Value Stream Map (VSM) posted | 1) Map current process steps and delays 2) Identify bottlenecks and WIP points 3) Post current-state map and target-state actions 4) Review monthly |
8–20 hrs | $0–$200 (printing/board) |
| Production flow arrows on floor | 1) Define intended material/workflow direction 2) Place arrows and station labels on floor 3) Remove conflicting paths; enforce staging discipline |
2–6 hrs | $50–$300 |
| Job travelers clipped to work | 1) Define traveler template (job, spec, steps, QC points) 2) Print and attach to carts/modules 3) Require sign-off at checkpoints |
4–12 hrs setup | $20–$200 (clipboards, sleeves) |
| Build status board (To Do / Doing / Done) | 1) Install board 2) Define columns and WIP limits 3) Standardize card format 4) Daily 10-minute update in huddle |
2–6 hrs setup; 10 min/day | $100–$600 |
| Daily production target board | 1) Define daily targets by station 2) Post planned vs actual 3) Review gaps and assign countermeasures |
2–4 hrs setup; 10 min/day | $20–$200 |
| WIP limit signs + queue max lines marked | 1) Set WIP caps per station (based on capacity) 2) Mark max queue footprints on floor 3) Enforce “stop starting, start finishing” |
2–6 hrs | $20–$200 |
| “Blocked” red tag cards (work stoppage visibility) | 1) Create blocked cards (reason, owner, timestamp) 2) Rule: any blocked work gets a card 3) Review in huddle; escalate if overdue |
1–3 hrs | $10–$50 |
| Downtime reason board (by machine/area) | 1) Define downtime codes and threshold (e.g., >10 min) 2) Post board near equipment 3) Require entries; review weekly trends |
2–6 hrs setup; 15 min/week | $20–$150 |
| Weekly lookahead board | 1) List next 1–2 weeks of work by zone 2) Identify constraints (materials, inspections, labor) 3) Update weekly with owners |
2–6 hrs setup; 30–60 min/week | $20–$250 |
| Visual daily huddle board | 1) Create huddle agenda (Safety/Quality/Delivery/Issues) 2) Post key metrics and today’s plan 3) Run 10-minute huddle at fixed time |
2–6 hrs setup; 10 min/day | $20–$250 |
| Material pull board (kitting/staging) | 1) Define kit lists per module/task 2) Create pull cards per kit 3) Staging area labeled by kit 4) Validate kit completeness before release |
6–20 hrs | $50–$600 |
| PPE required signage by zone | 1) Define PPE rules per zone 2) Post signs at entries 3) Enforce in daily huddle and gemba |
1–3 hrs | $50–$300 |
| Machine hazard labeling | 1) Label pinch points, hot surfaces, moving parts 2) Add lockout points labeling 3) Verify labels survive cleaning/abuse |
2–8 hrs | $50–$400 |
| Emergency exits clearly marked | 1) Verify egress paths are unobstructed 2) Install/refresh signage and floor markings 3) Monthly walk-through audit |
1–4 hrs | $50–$300 |
| Fire extinguisher locations outlined + signage | 1) Confirm correct extinguisher types/placement 2) Outline footprint and add sign above 3) Add inspection tag discipline |
30–60 min each | $10–$50 each |
| First aid station marked with stocked indicator | 1) Mount first aid cabinet at known location 2) Mark with signage and floor outline 3) Add simple “stock OK / stock low” indicator 4) Monthly restock owner |
1–3 hrs | $50–$300 |
| Lockout/tagout (LOTO) station with tags visible | 1) Install LOTO station near equipment cluster 2) Label lock points on machines 3) Train crew; enforce LOTO procedure |
4–12 hrs | $100–$800 |
| Safety cross board (days since incident / near-miss) | 1) Create board with daily boxes 2) Define what counts as near-miss 3) Update daily; review in huddle |
1–3 hrs setup | $20–$150 |
| First-piece approval board | 1) Define first-piece criteria and measuring tools 2) Create sign-off checklist 3) Require approval before batch/run proceeds |
4–10 hrs | $20–$200 |
| “Gold standard” sample parts displayed | 1) Select best-known-good samples 2) Mount in labeled display case near station 3) Replace when spec changes |
2–6 hrs | $20–$200 |
| Inspection checkpoints marked | 1) Identify critical-to-quality steps 2) Mark checkpoint location on flow board and physical area 3) Add go/no-go gauges or checklist |
4–12 hrs | $50–$800 (depends on gauges) |
| Error-proofing fixtures (poka-yoke) | 1) Identify top 3 recurring errors 2) Design simple physical constraint/jig 3) Pilot and validate defect reduction 4) Standardize across stations |
8–40 hrs (depends) | $50–$2,000 (materials + fabrication) |
| Go/No-Go gauges mounted visibly | 1) Identify critical dimensions 2) Procure/make go/no-go gauges 3) Mount at point-of-use with label and calibration date |
4–16 hrs | $50–$1,500 |
| Defect board with root cause tracking | 1) Create board: defect, frequency, cause, countermeasure, owner, due date 2) Log defects daily 3) Weekly review; close actions |
3–8 hrs setup; 30–60 min/week | $20–$200 |
| Calibration due-date tags on tools | 1) Identify tools requiring calibration (torque, meters, levels) 2) Add dated calibration labels 3) Create re-cal schedule and owner |
2–6 hrs | $20–$100 |
| FIFO lanes marked + date stickers | 1) Mark FIFO lanes for inbound/outbound 2) Add “oldest first” signage 3) Apply date stickers on receipt 4) Audit weekly for FIFO violations |
4–10 hrs | $50–$300 |
| Raw vs finished goods zones separated | 1) Define clear physical separation 2) Label zones and enforce no-mixing 3) Add simple inbound/outbound rules |
2–8 hrs | $50–$400 |
| Scrap bin clearly marked and isolated | 1) Place scrap bins at logical points 2) Label “scrap only” and outline footprint 3) Add rule: scrap never stored in WIP lanes |
1–3 hrs | $20–$200 |
| Supplier label standard | 1) Define receiving label format (date, vendor, lot, PO, location) 2) Print labels at receiving desk 3) Enforce: no unlabeled stock enters racks |
4–12 hrs setup | $50–$400 |
| Material staging racks at point of use | 1) Identify repeated staging needs per station 2) Procure/assemble racks/carts 3) Label rack positions and max WIP 4) Train: staging equals readiness |
6–20 hrs | $200–$2,000 |
| Reorder point visual cards | 1) Identify reorder items and lead times 2) Create reorder cards with min qty and supplier info 3) Place at reorder point in bin 4) Weekly verify stockouts |
3–10 hrs | $20–$200 |
| Preventive maintenance board | 1) List assets and PM intervals 2) Post board with due dates and owners 3) Record completion and issues found 4) Review weekly |
6–16 hrs setup; 1 hr/week | $50–$400 |
| Machine status lights (green/yellow/red) | 1) Select machines where downtime is costly 2) Install stack lights and button inputs 3) Define response rules per color 4) Train and enforce |
4–12 hrs per machine | $200–$1,500 per machine |
| Tool life tracker (bits/blades/consumables) | 1) Define wear-life rules per tool type 2) Create tracker (board or log) at station 3) Standard: replace before failure when threshold hit |
2–6 hrs setup | $0–$150 |
| Spare parts shadow board | 1) Identify top failure parts 2) Mount labeled storage for spares 3) Set min/max and reorder trigger |
4–10 hrs | $50–$500 |
| Maintenance log posted at machine | 1) Mount log holder at each machine 2) Record downtime, fixes, recurring faults 3) Review monthly to drive PM improvements |
1–2 hrs per machine | $5–$30 per machine |
| Gemba walk board | 1) Post schedule + checklist + action log 2) Run regular gemba cadence 3) Track closure rate and repeat issues |
2–6 hrs setup; 1–3 hrs/week | $20–$200 |
| Improvement tracking board (action log) | 1) Create board: issue, countermeasure, owner, due date, status 2) Review weekly; close items visibly 3) Archive completed improvements monthly |
2–6 hrs setup; 30–60 min/week | $20–$200 |
| KPI wall (SQDCM: Safety/Quality/Delivery/Cost/Morale) | 1) Choose 4–6 metrics with clear definitions 2) Post baseline and targets 3) Update weekly; discuss in huddle |
6–16 hrs setup; 30 min/week | $50–$800 |
| Escalation ladder posted | 1) Define escalation triggers (downtime, safety, quality) 2) Define levels (Lead → Manager → Exec) with response times 3) Post laminated chart at key points 4) Drill the process |
3–8 hrs | $10–$100 |
| Leadership standard work posted | 1) Define leader daily/weekly routines (gemba, audits, reviews) 2) Post checklist and time windows 3) Track adherence and adjust |
4–12 hrs | $20–$150 |
| Andon lights (call-for-help system) | 1) Install call button + light per station 2) Define response SLA and escalation 3) Log and analyze calls weekly |
6–16 hrs per line | $300–$2,500 per station/line |
| Digital dashboard screens (optional) | 1) Define what must be live (targets, WIP, alerts) 2) Mount displays and connect to data source 3) Assign owner for uptime and correctness |
8–30 hrs | $300–$3,000+ (screens + compute) |
| RFID tool tracking (check-in/out, portal events) | 1) Choose UHF passive tags and tag placement standard 2) Install portal reader at tool crib/exits 3) Configure software rules (authorized checkout vs alarm) 4) Add handheld reader for audits and recovery searches |
16–60 hrs (depends on scale) | $3,000–$25,000 (tags + readers + setup) |
| Barcode material tracking (optional) | 1) Standardize barcodes on received goods and internal kits 2) Add scanners at receiving and kitting 3) Integrate with simple inventory log |
8–30 hrs | $200–$2,000 |
| Visual torque verification marks | 1) Define which fasteners require torque verification 2) Use paint pen witness marks after torque 3) Train inspectors to spot missing marks |
1–4 hrs setup | $10–$100 |
| Laser-projected layout guides (optional) | 1) Identify repeated layout tasks (stud lines, cut lines, drill patterns) 2) Select projection system and mount rigidly 3) Calibrate and lock settings 4) SOP for calibration checks |
20–80 hrs | $1,000–$20,000+ |
| Smart Kanban bins (optional) | 1) Select high-usage consumables 2) Install sensors or e-kanban triggers 3) Configure reorder notifications 4) Validate against actual consumption |
10–40 hrs | $500–$10,000+ |
| Electronic traveler system (optional) | 1) Define traveler data model (steps, QC, sign-offs) 2) Choose device/workstation strategy (tablets/kiosks) 3) Pilot one line and iterate 4) Roll out with training |
40–200 hrs | $1,000–$30,000+ (devices + software) |
| Skill matrix board | 1) List roles/skills by station 2) Define rating scale (0–3) and evidence 3) Populate matrix and identify gaps 4) Update monthly/quarterly |
4–12 hrs setup; ongoing small | $20–$200 |
| Training progress board | 1) Define training modules and checkoffs 2) Post per-person progress 3) Update weekly; tie to assignments |
2–6 hrs setup | $20–$150 |
| Certification badges (role qualification visibility) | 1) Define cert criteria per role/tool (e.g., forklift, electrical) 2) Issue visible badges/stickers 3) Enforce: only certified persons run restricted operations |
4–12 hrs | $20–$300 |
| Core values display + “wins” highlight board | 1) Select 3–5 operating principles and behaviors 2) Post in high-traffic area 3) Add weekly “wins” with concrete examples and metrics |
2–6 hrs setup | $20–$200 |
Core Visual Workshop Costs: 5S + Flow + Safety + Boards
Scope (Included Systems)
- Floor zoning
- Shadow boards
- Labeling system
- Min/Max + Kanban (consumables control)
- Cleaning stations
- FIFO lanes
- WIP limits
- Status boards (work tracking)
- Safety visuals
- Audit boards (5S + safety + quality)
- Escalation ladder (who to call / when)
- KPI wall (SQDCM or similar)
- Skill matrix (training + qualification visibility)
- Defect board (quality at the source)
- PM board (preventive maintenance visibility)
Estimated Material Cost
- $4,000 – $12,000 (typical)
Cost Coverage (Typical Spend Categories)
- Tape/paint (floor lines, zone markings, arrows)
- Label printer + supplies (labels, label stock, laminating)
- Boards (whiteboards, magnetic boards, bulletin boards)
- Bins/racks (point-of-use storage, staging racks)
- Dividers/foam (drawer organization, tool shadowing)
- Signage (PPE, hazards, exits, instructions)
- Lighting upgrades (basic task lighting where needed)
- Basic maintenance tools (PM consumables, tags, holders)
Labor Effort
- 200–400 internal hours over 4–8 weeks (typical)
Baseline Standard
This is the baseline for a serious professional shop:
- Clear zones, labeled storage, and point-of-use organization
- Visible workflow status and WIP control
- Visible safety and quality standards at the workstation
- Regular audits with ownership and follow-up
- Metrics and escalation pathways posted and used
40-Hour Visual Workshop Sprint Plan
Objective
Establish a disciplined Core Visual Foundation in 40 hours (5 days × 8 hours):
- Defined zones and flow
- Zero tool searching at critical stations
- Controlled consumables
- Visible work status
- Clear escalation pathway
- Basic safety visibility
- Audit + accountability structure
No digital systems. No overengineering.
Day 1 (8 Hours) – Define and Mark Structure
1. Map Zones (2 hrs)
- Walk entire shop
- Define: Raw, WIP, Finished, Scrap, Tool Crib, Staging
- Sketch layout
- Assign color standard
2. Floor Marking (4 hrs)
- Tape/paint zone boundaries
- Mark walkways
- Mark no-storage zones
- Mark FIFO lanes
3. Post Zone Legend (1 hr)
- Print large color legend
- Mount at entry and near huddle board
4. End-of-Day Walkthrough (1 hr)
- Remove violations
- Relocate misplaced materials
Outcome: Chaos now has borders.
Day 2 (8 Hours) – Eliminate Tool Searching
1. Identify Top 2 Pain Stations (1 hr)
- Where is search time highest?
2. Install Shadow Boards (4 hrs)
- Mount boards
- Outline tools
- Label homes
- Remove duplicates
3. Fix Worst Drawers (2 hrs)
- Add dividers or foam
- Eliminate mixed bins
4. Tool ID + Home Rule (1 hr)
- Label tools
- Establish rule: tool leaves = tool returns
Outcome: Immediate search time reduction.
Day 3 (8 Hours) – Consumables & Material Control
1. Select Top 20 Consumables (1 hr)
- Fasteners, blades, adhesives, etc.
2. Install Min/Max System (3 hrs)
- Add fill lines
- Install Kanban cards
- Assign reorder owner
3. Clean & Set-in-Order Blitz (3 hrs)
- Remove dead inventory
- Organize by frequency of use
- Eliminate mixed scrap
4. Define Scrap & Rework Area (1 hr)
- Clearly mark
- No mixing with WIP
Outcome: Reduced stockouts and clutter.
Day 4 (8 Hours) – Flow & Visibility
1. Install Status Board (2 hrs)
Columns:
- To Do
- Doing
- Done
- Blocked
2. Define WIP Limits (1 hr)
- Mark max queue footprint per station
3. Create Daily Huddle Board (2 hrs)
Sections:
- Safety
- Quality
- Delivery
- Issues
4. Install Escalation Ladder (1 hr)
- Define triggers
- Define escalation tiers
- Post chart visibly
5. First-Piece Quality Standard (2 hrs)
- Define critical QC check
- Post checklist at station
Outcome: Work becomes visible.
Day 5 (8 Hours) – Sustain & Control
1. Install 5S Audit Board (2 hrs)
- Define scoring (0–2 scale)
- Assign zone owners
- Post audit cadence
2. Install KPI Wall (2 hrs)
Basic metrics:
- Safety
- Throughput
- Defects
- On-time completion
3. Install PM Board (2 hrs)
- List machines
- Add due dates
- Assign owner
4. Safety Visual Sweep (1 hr)
- PPE signage
- Fire extinguisher marking
- Exit visibility
5. Final Walkthrough + Rule Setting (1 hr)
Establish 3 hard rules:
- Nothing stored outside zones
- Tools return to home
- WIP limits enforced
Outcome: Accountability structure in place.
Cost Estimate
Materials
- $2,000 – $6,000 typical
Labor
- 40 internal hours
Measurable Outcomes After One Week
- 30–60% reduction in tool search time
- Fewer stockouts
- Clear bottlenecks visible
- Reduced clutter
- Faster daily huddles
- Visible ownership of areas
Sustainment Rule
After completion:
- Schedule 1-hour weekly sustainment block
- Run weekly audits for 4 consecutive weeks
- Do not add complexity until discipline stabilizes
Discipline first. Systems later.