04/30/12

  • Resource Development Team - Jared and Aaron - April 30, 2012*

  • Brainstorming and debriefing from the resource development team


  • Monday April 30 at Factor eFarm*




04/26/12

  • Quick Attach Wheels Walkthrough*



04/23/12

  • HabLab Update April 23*

  • Update with Floyd
  • Windows and glazing coming in






04/21/12

  • LifeTrac development at Creation Flame*

  • LifeTrac update from Creation Flame
  • Prototype 3 to prototype 4 developments




04/20/12

  • Khuong Dinh's bid for Scrum Master position at OSE*

  • Points out what it takes to be a Scrum Master


  • Quick Connect Wheel Update*

  • QC Wheel update with Marcin
  • Instructions on spacing and welding, bearings, washers and other QC elements





04/19/12

  • WIKISPEED Car Update April 19*



04/18/12

  • OSE Car Progress*

  • Chasis built using 4x4 tubing
  • Module explanation and run through of mods
  • Possible future modifications



  • OSE Car Update April 18, 2012*




04/17/12

  • April 17 Update*

  • Canadian invasion with Andrew
  • Jose, Marcin and Andrew update us with quick connect wheels
  • Surprise cameo by cupcakes


  • OSE & Wikispeed - Kickstarter Planning*



  • Problem Statement: Cutting Aluminum Tubes*

  • Lola the Dog, Paul and Rob discuss current band saw issues and solutions
  • Figure out how to reduce material waste


  • Safety: Lock-Out/Tag Out Procedures*

  • Importance of locking-out and tagging-out equipment when not in use, even when--or especially when--broken or incomplete


  • Short circuit pt. 1: Electrical Short in Wiring*





04/16/12

  • HabLab April 16*

  • Marcin does walkthrough of near-finished HabLab



04/14/12

  • April 14 in San Francisco*

  • In San Fran to meet with capital investors and 20 under 20 program to serve as mentors


  • Yoonseo's 2 Minute Application Speech*



04/12/12

  • April 12 update*

  • An upside-down update: faux state of emergency -- connected welder then inverter snapped
  • Continuance of SCRUM management program process


04/11/12

  • Daily standup April 11*

  • Got supplies for quick-attach wheels, setup second welder, loader arms on tractor


  • Axial Loads*

  • Wheel assembly working setup for quick coupling



04/10/12

  • April 10 Daily Standup*

  • Workshop trudges on, got trailer of shelving for major storage space
  • Update on loader arms, connecting welder and inverters


04/09/12

  • Intro Video Blog with Andrew Bateman*

  • Videographer, Andrew Bateman, comes to FeF next week to document the process with snazzy video



04/09/12

  • Standup april 9*

  • Inverters working and power is finally up




04/06/12

  • April 6 Standup*

  • SCRUM meeting progress update
  • Batteries almost hooked up
  • Project development platform ready
  • Indian True Fan contributes new CAD


  • HabLab April 6*

  • Finishing touches on HabLab like bathroom fixtures, doors, skylight, tile, cabinetry, etc.



  • Stackable Inverter Troubleshooting*

  • Marcin encounters some problems, and solutions?, with the stackable inverter





04/05/12

  • April 5 Update*

  • Marcin and Jose discuss work on welder


  • James Slade and shallow well*

  • Explains trench and well


  • HabLab April 5 Update*

  • HabLab nearly done
  • Framing, glazing and other final touches


  • Bus bar fabrication*



04/04/12

  • March 4 Daily Standup*

  • Describes final position of batteries
  • Describes work done and what's on the plate for tomorrow
  • Jose works on the tractor
  • Communications plan -- Google Hangout


  • Extreme Manufacturing Project Page*

  • Description of Extreme Maufacturing Process and wiki documentation
  • 50 pages will be created in all, divided into groups with project manager/SCRUM master and product owners
  • Project Page Tutorial



04/03/12

  • Daily standup March 3*

  • SCRUM process documentation continues



  • Sweating terminal lugs for inverter/battery system*

  • Process to put connector onto battery terminal lug


  • HabLab April 3*

  • HabLab update: a lot of rain but nearly there



04/02/12

  • Monday April 2 Standup FeF*

  • FeF group begins development method
  • Marcin and Jose describe the momentum gained with SCRUM method


04/01/12

  • April 1 Update*

  • Game Starts: extreme manufacturing process, peopel recruitment, beta-testing pipeline development
  • Writing out the steps for open-source product development